Antimony & Silver Project Acquisition
Released
Released
Announcement PDF
ASX Announcement | 23 October 2024
ASX Code: LDR
ADVANCED HIGH-GRADE ANTIMONY
& SILVER PROJECT AQUISITION
Lode Resources Ltd (ASX:LDR) (“Lode”, or the “Company”) is pleased to announce it has
signed a heads of agreement to acquire 100% of the Montezuma Antimony Project located
in Tasmanian’s premier West Coast Mining Province. This project includes a high-grade
antimony-silver-lead deposit with initial development, advanced metallurgy, significant
mining equipment and beneficiation infrastructure.
Highlights
•
High-grade Montezuma antimony-silver-lead deposit defined by surface channel
sampling, exploration adit face sampling and diamond drill core sampling.
➢
Surface grab samples grade up to 24.5% antimony (Sb) & 3,050 g/t
silver (Ag)
➢
Diamond drill core samples grade up to 20.3% antimony (Sb) & 1,990g/t
silver (Ag)
➢
Development face samples grade up to 21.4% antimony (Sb) & 2,478g/t
silver (Ag)
•
Development of portal box cut and commencement of exploration drive has
produced stockpiled mineralisation. Representative bulk sampling of combined
mineralisation/waste averaged 4.75% antimony (Sb) & 239 g/t silver (Ag) and
representative bulk sampling of mineralisation only, averaged 9.02% antimony (Sb)
& 769 g/t silver (Ag) reconciling well with corresponding face sampling.
•
Metallurgical test work is well advanced with 90% recoveries of antimony achieved
producing a saleable antimony product.
•
R&D funding discussions are ongoing with local and international institutions
including those representing major western governments.
•
Montezuma Antimony Project acquisition complements Lode’s antimony exploration
portfolio in the New England Fold Belt, NSW’s most prolific antimony province.
Together, these assets create a formidable Antimony division within Lode.
•
Also compliments Lode's high-grade Silver portfolio with assays due shortly from
the Webbs Consol Silver project where drilling at the Castlereagh prospect has been
completed.
•
Montezuma Antimony Project acquisition terms include:
➢ $50,000 non-refundable cash deposit payable within 2 business of execution of the HOAie 22
October 2024; plus
➢ $200,000 cash payable on completion of the Proposed Acquisition; plus
➢ 10,000,000 fully paid ordinary shares in the Company at a deemed issue price of $0.10per
share on completion of the Proposed Acquisition subject to 12-month escrow; plus
➢ Up to 6,000,000 fully paid ordinary shares in the Company at a deemed issue price of $0.10
per share upon satisfaction of certain performance hurdles by the Sellers (key terms are
outlined in Annexure 1) and subject to 12-month escrow.
➢ The fully paid ordinary shares will be issued under listing rule 7.1 using the Company's
existing capacity.
Legal/88950465_8
ASX Code: LDR
|
ACN: 637 512 415
A: Level 5, 1 Margaret St Sydney NSW 2000
|
|
www.loderesources.com
P: +61 2 9199 8017
|
E: info@loderesources.com
Proposal to Acquire Montezuma Antimony Project
The Montezuma Antimony Project includes a high-grade antimony-silver-lead deposit with initial
development, advanced metallurgical test work and significant beneficiation infrastructure.
Figure 1. Commencement of underground
development – 50m exploration drive to
feed pilot plant
Figure 3. Significant services infrastructure
includes recently constructed tailings dam,
raw water dam and grid power
Figure 2. Saleable antimony product sodium
pyroantimonate (Na4Sb2O7) produced during
metallurgical test work
Figure 4. Significant beneficiation
infrastructure including crushing and
grinding equipment
2
Montezuma Antimony Project Deposit
The Montezuma Antimony Project deposit (2M-2023, EL7-2019) is located between well-known
mining centres such as Rosebery (Zn,Cu,Pb), Renison Bell (Sn), Henty (Au) and Zeehan(Pb,Ag).
Access is via the Zeehan township located 14km to the west.
Figure 5. Montezuma Antimony Project located in Tasmanian’s premier West Coast Mining Province
The Montezuma antimony-silver-lead deposit is a structurally controlled lode, emplaced primarily
within the well-known Motezuma fault and hosted by a sequence of turbidites. Antimony and lead
are contained within Jamesonite, a lead-iron-antimony sulphide mineral (Pb4FeSb6S14) and is a
late-stage hydrothermal mineral forming at moderate to low temperatures. This project is also
prospective for copper, zinc and gold.
The Montezuma antimony-silver-lead deposit is defined by surface sampling of the exposed
mineralised structure over 50m strike length, development face sampling and 13 diamond drill holes
which have intercepted high-grade mineralisation down to a depth of 80m. The Montezuma
antimony-silver-lead deposit remains open to the north, south and at depth.
Cautionary Statement: All Eploration Results from the Montezuma antimony-silver-lead deposit are considered to be
“historical”, not reported in accordance with the JORC Code 2012 and a Competent Person has not done sufficient work
to disclose the Exploration Results in accordance with the JORC Code 2012. It is possible that following further evaluation
and/or exploration work that the confidence in the prior reported Exploration Results may be reduced when reported
under the JORC Code 2012. Nothing has come to the attention of the acquirer that causes it to question the accuracy or
reliability of the former owner’s Exploration Results. Lode has not independently validated the former owner’s Exploration
Results and therefore is not to be regarded as reporting, adopting or endorsing those results. Nevertheless, these
exploration results are considered to be material to the acquisition and thus price sensitive. Please refer to Annexure 2
JORC 2012 Table 1 of this announcement for descriptionsof sampling methods used. Lode plans to review all exploration
sampling to date during the due diligence period under the heads of agreement so as to determine what remedial actions
are needed to bring exploration results up to JORC standards. Such actions may include resampling of drill core,
surveying drill collars, etc, in addition to further explorationwork.
3
Montezuma Antimony Project Surface Sampling
Surface grab samples have been taken from trenches perpendicular to strike and at 5m intervals
along a 50m exposure of the Montezuma antimony-silver-lead deposit. With reference also to the
cautionary statement above, surface samples have graded up to 24.5% antimony (Sb), 3,050
g/t silver (Ag) and 39.1% lead (Pb).
These surface sample antimony grades ranged from 4.36%to 24.50%, silver (Ag) grades ranged
from 124 g/t to 3,050 g/t and lead (Pb) grades ranged from 6.81% to 39.08%. Average grades are
11.9% antimony (Sb), 843 g/t silver (Ag) and 18.0% lead(Pb).
Table 1. Montezuma antimony-silver-lead deposit surface sample assays
- taken at 5m intervals along 50m strike traverse
Figure 6. Montezuma antimony-silver-lead deposit - surface sample positions
Cautionary Statement: Grab sampling is selective in nature with resultant assay grades considered to be qualitative
rather than quantitative and not necessarily representative of underlying mineralisation which may actually be lower or
higher in grade.
4
Montezuma Antimony Project Diamond Drilling
To date 13 diamond drill holes have intercepted mineralisation at the Montezuma antimony-silverlead deposit, 4 holes from the hanging wall (MZSHW1-4) and 8 holes from the footwall (MZSFW18). Diamond drill core samples have graded up to 20.3% antimony (Sb), 1,990 g/t silver (Ag) and
27.0% lead (Pb). This is in addition to the historical Electrolytic Zinc (EZ) hole MZP245A.
Table 2. Montezuma antimony-silver-lead deposit – diamond drill hole assay results
Drill Hole
Number
MZSFW1
MZSFW2
MZSFW3
MZSFW4
MZSFW5
MZSFW6
MZSFW7
MZSFW8
MZSHW1
MZSHW2
MZSHW3
MZP245A
From
m
4.50
12.10
9.40
7.50
3.30
3.00
16.70
11.10
21.00
22.90
28.50
80.85
To
m
11.60
17.85
12.20
10.50
8.20
6.46
20.70
13.60
21.50
24.00
29.20
81.45
Interval
m
7.10
5.75
2.80
3.00
4.90
3.46
4.00
2.50
0.50
1.10
0.70
0.60
Sb
%
1.70
6.60
10.20
0.20
10.50
1.78
6.04
6.44
4.70
3.82
10.70
10.70
Ag
g/t
216
257
1,470
164
1,010
381
620
747
517
226
1,560
1,080
Pb
%
3.47
13.60
15.40
0.15
13.80
2.76
8.18
8.43
6.83
6.03
13.50
24.40
Drilling to date has primarily been designed to target the Montezuma antimony-silver-lead deposit
ahead of adit drive development. The southern most hole (MZSFW7) resulted in an intercept of 4m
(16.7m to 20.7m) grading 6.04% Sb, 8.18% Pb, 620 g/t Ag including an individual assay of 0.5m
(19.7m to 20.2m)at 20.3% Sb, 26.7% Pb, 824 g/t Ag.
Table 3. Montezuma antimony-silver-lead deposit – drill hole MZSFW7 individual interval assays
Sample
Number
MZS07-1
MZS07-2
MZS07-3
MZS07-4
MZS07-5
MZS07-6
MZS07-7
MZS07-8
Intercept
Inc. Intercept
And Intercept
From
m
16.70
17.20
17.70
18.20
18.70
19.20
19.70
20.20
16.70
16.70
19.70
To
m
17.20
17.70
18.20
18.70
19.20
19.70
20.20
20.70
20.70
18.70
20.70
Interval
m
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
4.00
2.00
1.00
Sb
%
7.44
0.96
8.13
5.72
0.85
1.60
20.30
3.30
6.04
5.56
11.80
Ag
g/t
1,450
559
857
429
339
334
824
164
620
824
494
Pb
%
9.38
1.19
10.85
7.53
1.28
2.37
26.70
6.15
8.18
7.24
16.43
The Montezuma antimony-silver-lead deposit remains open to the north, south and at depth.
Beside underground development and drilling, initial assessment work will be carried out to
determine the best approach to define deposit extensions as well as potential parallel mineralised
structures (see Figure 15)T.
5
Table 4. Montezuma antimony lead deposit – diamond drill hole information
Hole_ID
MZSFW1
MZSFW2
MZSFW3
MZSFW4
MZSFW5
MZSFW6
MZSFW7
MZSFW8
MZSHW1
MZSHW2
MZSHW3
MZSHW4
MZP245A
Easting
m ( GD A 9 4 )
373147.2
373146.4
373147.4
373148.6
373148.2
373148.7
373142.0
373142.0
373167.1
373167.1
373167.6
373167.6
373196.9
Northing
m ( GD A 9 4 )
5364147.8
5364148.1
5364152.0
5364152.2
5364155.4
5364157.0
5364143.0
5364143.0
5364168.1
5364168.1
5364167.2
5364167.2
5364188.1
RL
m
630.1
629.8
630.0
630.3
630.5
630.7
630.0
630.0
634.5
634.5
634.5
634.5
636.0
Azi
deg
105
105
65
65
33
31
105
105
255
255
235
235
241
Dip Depth
deg
m
-40 12.50
-48 21.00
-45 16.10
-42 12.70
-48
8.50
-40
7.60
-40 30.00
-30 18.00
-45 31.50
-60 36.00
-60 34.50
-50 34.50
-78 374.00
From
m
4.50
12.10
9.40
7.50
3.30
3.00
16.70
11.10
21.00
22.90
28.50
To Interval
m
m
11.60
7.10
17.85
5.75
12.20
2.80
10.50
3.00
8.20
4.90
6.46
3.46
20.70
4.00
13.60
2.50
21.50
0.50
24.00
1.10
29.20
0.70
Pending
80.85 81.45
0.60
Figure 7. Montezuma Antimony Project diamond drill rig suitable for surface and underground drilling – one
of multiple pieces of equipment being acquired
Montezuma Antimony Project Development Face Sampling
Development of the portal box cut and exploration drive has commenced with samples taken from
three development faces up to the initial adit face, each representing a 2.4m cut (drilled, charged,
blasted, mineralised/waste rock removed and stockpiled).
Development face samples have graded up to 21.4% antimony (Sb), 2,478 g/t silver (Ag) and
44.3% lead (Pb). Antimony (Sb) grades ranged from 1.54% to 21.40%, lead (Pb) grades ranged
from 2.13% to 44.3% and silver (Ag) grades ranged from 93 g/t to 2,478 g/t.
Total interval grades for face sampling are 9.3% antimony (Sb), 306 g/t silver (Ag) and 16.7%
lead (Pb) over 1.85m for development face LT1, 7.8% antimony (Sb), 804 g/t silver (Ag) and
10.9% lead (Pb) over 2.20m for development face LT2 and 6.2% antimony (Sb), 301 g/t silver
(Ag) and 11.7% lead (Pb) over 2.00m for development face LT3.
6
Table 5. Montezuma antimony-silver-lead deposit – sampling of three development faces
Sample
Number
LT101
LT102
LT103
LT1 Total Interval
LT201
LT202
LT203
LT204
LT2 Total Interval
LT301
LT302
LT303
LT3 Total Interval
Easting Northing
m ( GD A 9 4 ) m ( GD A 9 4 )
RL
m
From
m
0.00
373154.2 5364182.0 620.0 0.50
1.45
0.00
0.00
0.50
373154.3 5364178.1 620.0
1.10
1.60
0.00
0.00
373154.0 5364176.3 620.3 0.30
0.50
0.00
To
m
0.50
1.45
1.85
1.85
0.50
1.10
1.60
2.20
2.20
0.30
0.50
2.00
2.00
Interval
m
0.50
0.95
0.40
1.85
0.50
0.60
0.50
0.60
2.20
0.30
0.20
1.50
2.00
Sb
%
17.50
3.07
13.90
9.31
18.65
5.90
6.78
1.54
7.81
13.65
21.40
2.66
6.18
Ag
g/t
434
186
431
306
2,478
346
534
93
804
1,170
462
106
301
Pb
%
34.00
5.26
22.40
16.73
25.80
8.49
9.21
2.13
10.85
21.00
44.30
5.51
11.71
Figure 8. Montezuma antimony-silver-lead deposit – showing development face channel samples assays
(LT101, LT102, LT103)
186 g/t Ag
34.0% Pb
22.4% Pb
Charged blast
holes ready to be
fired
Currently the Montezuma Antimony Project has approval to bulk sample 1,000t from a 50m
exploration drive. This will allow better definition of the mineralised lode through face mapping and
sampling as well as the establishment of suitable drill positions for deeper drilling. It is intended that
exploration drive development mineralisation will be processed through the project’s pilot scale
beneficiation plant. Currently, development mineralisation has been stockpiled for treatment at a
later date or even, potentially, sold as direct shipped ore (DSO).
7
Montezuma Antimony Project Stockpiled Mineralisation
Development of a portal box cut and the commencement of an exploration drive has produced
stockpiled mineralisation. Representative sampling of a combined mineralisation/waste batch
averaged 4.75% antimony (Sb), 239 g/t silver (Ag) and 9.36% lead (Pb) and representative
sampling of a mineralisation only batch averaged 9.02% antimony (Sb), 769 g/t silver (Ag) and
15.47% lead (Pb) which reconciles well with corresponding face sampling – see LT1 Total Interval
in Table 4.
Table 6. Montezuma antimony-silver-lead deposit – representative sampling of combined development
mineralisation/waste
Sample
Number
DSO1 All in
DSO2 All in
DSO3 All in
DSO4 All in
Average
Sb
%
4.16
4.30
5.25
5.29
4.75
Ag
g/t
232
237
244
243
239
Pb
%
8.48
8.87
9.88
10.20
9.36
Table 7. Montezuma antimony-silver-lead deposit – representative sampling of develpment mineralisation
only
Sample
Number
DSO11/22 01
DSO11/22 02
DSO11/22 03
Average
Sb
%
7.96
9.01
10.10
9.02
Ag
g/t
917
672
718
769
Pb
%
12.85
16.30
17.25
15.47
Figure 9. Montezuma Antimony Project mining equipment and stockpiled development mineralisation,
potentially DSO.
8
Figure 10. Montezuma antimony-silver-lead deposit – Trench grab sample SGD+25, assays returned 24.5% Sb,
501g/t Ag and 39.8% Pb
9
Montezuma Antimony Project Beneficiation Plant
The Montezuma Antimony Project’s pilot scale beneficiation plant is located 15km to the northwest
of the Zeehan township. Infrastructure includes connection to grid power, cone crusher, ball mill,
gravity tables, spirals, tankage, raw water and a recently constructed tailings dam. Trial pilot scale
beneficiation treatment of Montezuma mineralisation is planned once metallurgical parameters,
tankage configuration and permitting are finalised.
Figure 11. Montezuma Antimony Project - beneficiation plant and associated services infrastructure
Beneficiation Plant
Raw Water Dam
New Tailings Dam
Significant bench scale metallurgical work has been carried out to date by Core Resources, a
Brisbane based metallurgical project development firm. Finalisation of this work is needed. “Core
has completed flowsheet design, test work and engineering plans for the Montezuma Antimony
Project. This work has involved developing an innovative approach to recovering antimony from
Jamesonite, whilst recovering silver and lead by-products in a low-cost and straightforward process
flowsheet that could be implemented on site using readily available equipment.”1
Metallurgical test work (See Figure 13) on a batch of development mineralisation involved bulk
leaching, hydrocycloning remaining solids to produce a separate a Pb/Ag product (See Table 8),
oxidation, crystallization and precipitation of an antimony compound with a 90% antimony recovery
and 47% antimony content by weight was achieved.
The resultant product sodium pyroantimonate (Na4Sb2O7) is primarily used as a glass clarifier and,
given its application in solar panels, has particularly strong demand growth. Additional metallurgical
test work may include the production of synthetic antimony (Sb2S3). This product has smelter
applications, in particular as a harder in lead alloys. Testwork to date has primarily focused on
maximising antimony recoveries. Further metallurgical work is needed to determine silver and lead
recoveries, however high-grade concentrate grading 2,575 g/t Ag and 60% Pb has already been
achieved.
Table 8. Silver-Lead concentrate grades from
cyclone overflow (-C5 configuration)
Bulk
Cyclone
Batch 1 O/F
Batch 2 O/F
Average
1
Ag
g/t
2,390
2,760
2,575
Figure 12. Concentrate product using various cyclone
configurations
Pb
%
60.30
60.90
60.60
https://coreresources.com.au/unlocking-antimony-core-resources-expertise-amid-global-supply-challenges/
10
Figure 13. Montezuma Processing Flowsheet
Figure 14. Montezuma Alkaline Sulphide Leaching and Air Oxidation Test Set Up
11
Montezuma Antimony Project Exploration Potential
The deepest drill hole to date is MZP245A drilled by the Electrolytic Zinc Company(EZ) in 1983.
Resampling of this core, stored at the Tasmanian Geological Survey has shown a mineralised
intercept of 0.63m grading 11.58% antimony (Sb), 683 g/t silver (Ag) and 25.64% lead (Pb). This
hole has been sampled only for what was considered the highest-grade mineralisation so further
assaying is needed of the remaining mineralised core to determine full intercept width. Importantly,
this intercept demonstrates the potential continuity of mineralisation at depth. Given that
mineralised lode thickness pinches and swells along strike at surface, it is also likely that this also
occurs at depth and thus forming steep plunging shoots within the Motezuma lode structure. This
is often the result of structural “kinks” and identifying these is important in defining drill targets within
the lode structure, both at depth and laterally along strike.
Table 9. Montezuma antimony-silver-lead deposit – EZ diamond drill hole results
Sample
From
Number
m
001
80.82
002
81.15
Intecept 80.82
To
m
81.15
81.45
81.45
Interval
m
0.33
0.30
0.63
Sb
%
10.70
12.55
11.58
Ag
g/t
1,080
247
683
Pb
%
24.40
27.00
25.64
Figure 15. Montezuma antimony-silver-lead deposit – deeper drill targeting
West
East
Exploration
Drill Target
Under Sampled
Mineralised Intercept
in EZ Drill Hole
12
Figure 16. Plan view of Montezuma drilling and grab samples
This announcement has been approved and authorised by Lode Resource Ltd’s
Managing Director, Ted Leschke.
For more information on Lode Resources and to subscribe for our regular updates, please visit our website
at www.loderesources.com or email info@loderesoruces.com
No Material Changes
The Company confirms it is not aware of any new information or data that materially affects the
information included in this announcement and that all material assumptions and technical
parameters underpinning the exploration activities in this market announcementscontinue to apply
and have not materially changed.
Competent Person’s Statement
The information in this market announcement that relates to exploration results is based
on information compiled by Mr Jason Beckton, who is a Member of the Australian Institute
of Geoscientists. The information in this market announcement is an accurate
representation of the available data for Montazoma project. Mr Beckton, who is Executive
Director – Resource Development at Lode, has sufficient experience which is relevant to
the style of mineralisation and type of depositunder consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Beckton has a beneficial interest as ashareholder and option holder of Lode
and consents to the inclusion in this announcementof the matters based on the information
in the form and context in which it appears.
13
Annexure 1 Summary
Heads of Agreement to Acquire Tasmanian Mining Tenements
The board of Lode Resources Ltd ACN 637 512 415 (ASX: LDR) (Company) is pleased to
announce it signed a binding heads of agreement on 18 October 2024 (HOA) with Steven
McDermott and Keith McDermott (Sellers), and Ten Star Mining Pty Ltd ACN 113 022 914 (Ten
Star Mining) to acquire 100% of the issued capital of Spero Mining Pty Ltd ACN 640 542 347
(Spero Mining) (Proposed Acquisition), for the following consideration:
•
$50,000 non-refundable cash deposit payable within 2 business of execution of the HOA
ie 22 October 2024; plus
•
$200,000 cash payable on completion of the Proposed Acquisition; plus
•
10,000,000 fully paid ordinary shares in the Company at a deemed issue price of $0.10 per
share on completion of the Proposed Acquisition; plus
•
up to 6,000,000 fully paid ordinary shares in the Company at a deemed issue price of
$0.10 per share upon satisfaction of certain performance hurdles by the Sellers.
Ten Star Mining is the wholly owned subsidiary of Spero Mining. The Sellers, Spero Mining and
Ten Star Mining are the registered and beneficial owners of the mining tenements in Tasmania
detailed below (Tenements), which are subject to the Proposed Acquisition.
Project
Montezuma
Antimony
Heemskirk Tin
– Globe Sivler
Mine
Teneme
ntNo.
2M-02023
Holder
Location
Area
K & S McDemott
Date of
expiry
28/12/2025
Moore's Pimple,
Montezuma Nth
5 ha
EL7-2019
Spero Mining
24/03/2020
Moore's Pimple
4 sq km
2M-2018
Ten Star Mining
05/03/2027
Donnelly's Lookout,two
separate areas
78 ha
32M-1988
Ten Star Mining
01/11/2024
Granville Harbour, Mt
Heemskirk dolerite rock
quarry,within EL9-2019
1 ha
EL9-2019
Ten Star Mining
10/06/2026
Vicinity of Heemskirk Rd
91 sq km
Due Diligence to be undertaken and Acquisition Document to be negotiated
The Proposed Acquisition is subject to satisfactory completion of legal, financial, technical and
contractual due diligence amongst others conditions precedent.
14
Annexure 1 Material Terms of Heads of Agreement
Proposed
acquisition
100% (100 shares, referred to as Sale Shares) of the issued share capital in Spero
Mining Pty Ltd (Spero Mining) and thereby 100% of the shares in Ten Star Mining
Pty Ltd (Ten Star Mining), a wholly owned subsidiary of Spero Mining and the
tenements owned by Spero Mining and Ten Star Mining.
Counterparty Steven McDermott, Keith McDermott and Ten Star Mining
Spero Mining
and Ten Star
Mining
Project
Montezuma
Antimony
Tenement
No.
2M-2023
EL7-2019
Heemskirk
Tin – Globe
Siler Mine
Purchase
Price
2M-2018
Holder
K&S
McDermott
Spero
Mining
Ten Star
Mining
Date
of
expiry
28/12/2025
24/03/2020
05/03/2027
32M-1988
Ten Star
Mining
01/11/2024
EL9-2019
Ten Star
Mining
10/06/2026
Location
Area
Moore's Pimple,
Montezuma Nth
Moore's Pimple
5 ha
Donnelly's
Lookout, two
separate areas
Granville Harbour,
Mt Heemskirk
dolerite rock
quarry, within
EL9-2019
Vicinity of
Heemskirk Rd
78 ha
4 sq km
1 ha
91 sq km
In consideration, the Company agrees to pay the following to the Sellers:
A.
$50,000 non-refundable within two days from execution of the HOA
(SigningConsideration);
B.
$200,000 in cash on the completion date (Completion Payment);
C.
10,000,000 fully paid ordinary shares in the Company on the
completion date (Consideration Shares);
up to 6,000,000 fully paid ordinary shares (Performance Shares) within
seven days of satisfaction of the below performance conditions:
D.
i.
ii.
iii.
iv.
v.
E.
research and development grant from AusIndustry – R&D Tax Incentive with
minimum R&D refund of $50,000;
submission of US Department of Defence white paper;
achieve a JORC Mineral Resources estimate with no minimum tonnage or
grade required;
antimony offtake agreement for a minimum of 85 tonnes; and
completion of a 50m exploration drive.
The performance shares have an expiry date of 30 June 2026 and if the
above milestones are not achieved by the expiry date the performance
shares will be cancelled.
Note that:
F.
the Signing Consideration is non-refundable; and
G.
the Consideration Shares and Performance Shares will be subject to 12
months voluntary escrow from the date of issue.
15
Expected
completion
date
Completion date is the date notified by the Company within 7 business days
after all the conditions precedent to completion (see below) have been
satisfied or waived.
Source of
funds to pay
the Purchase
Price
The Company will fund the Purchase Price using existing funds held within
its cash reserves.
Conditions
precedent to
Completion
The following key conditions precedent must be satisfied prior to completion:
• (Due Diligence): the Company completing and being fully satisfied with its
financial, legal, technical, operational and contractual due diligence
investigations into Ten Star Mining and Spero Mining.
• (Shareholder Approvals): if required, approval from the Company's
shareholders for the issue of the Consideration Shares.
• (Regulatory Approvals): receipt of the relevant minister's, consent for the
transfer of the Tenements to the Company.
The parties have also agreed to enter into a formal agreement detailing the full
terms of the Proposed Acquisition (Acquisition Document). Lode may choose not
to proceed with the Proposed Acquisition if it is not satisfied with the results of its
due diligence investigations in Spero Mining or Ten Star Mining. Investors should
note that as a result of that conditionality, there can be no guarantee that the
parties will proceed with completion of the Proposed Acquisition.
Should the parties choose to proceed with the Proposed Acquisition under the
Acquisition Document, key terms of the Acquisition Document will also be
announced.
Changes to
Board/senior
management
The proposed acquisition will not result in any change to the board, however Steve
McDermott and Keith McDermott will be retained as employees of the Company
to facilitate the integration of the companies and in the hopes of achieving those
performance conditions which will entitle them to Performance Shares
16
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
•
•
•
•
•
•
•
•
•
•
•
•
All exploration work by Spero and EZ is considered Historical and Material to the
acquisition.
All exploration results such as grab sampling, diamond drill core sampling, face sampling
was sourced directly from Spero’s files. Spero is a private company and has not issued
any public reports to date. The one exception is drill hole MZP245A drilled by Electrolytic
Zinc Company of Australasia Ltd but with Spiro assaying the core as reported in this
market announcement.
Spero’s exploration work does not conform to JORC Code 2012 requriements.
Lode has reviewed all the data and has visited the Montezuma Antimony Project. Lode
considers the data to be reliable but not JORC Code 2012 compliant.
The work programmes to date are well documented in the text of this announcement and
represents a summary of all work programmes completed to date.
Lode plans to review all exploration sampling to date during the due diligence period
under the heads of agreement so as to determine what remedial actions are needed to
bring exploration results up to JORC standards. Such actions may include resampling of
drill core, surveying drill collars, etc, in addition to further exploration work.
Spero NTW diamond core was logged and sample intervals assigned based on the
geological contacts.
The core to be sampled was sawn in half and bagged according to sample intervals.
Samples were cut, measured and bagged by Spero employees.
Spero diamond core samples were processed at ALS or Core Resources laboratory
where they were crushed and split to 3kg then pulverized to 85% passing 75 microns.
Surface samples were taken using a rock drill with a short steel for control, a large 52mm
reaming bit was used to ensure the drill chipped off samples and didn't begin to collar.
Samples were taken across the high-grade mineralisation from footwall to hanging wall at
5m intervals along strike. Samples were pulverized to 85% passing 75 microns at Core
Resources Laboratory.
Representative sampling of a combined mineralisation/waste batch and representative
sampling of a mineralisation only were taken by blind grab x 2 for every tonne from the
17
Criteria
JORC Code explanation
Commentary
polyweave bulk bags and placed in a drum that was mixed and then samples taken from
this drum for analysis. Samples were pulverized to 85% passing 75 microns at Core
Resources Laboratory (See Tables 6 & 7).
Drilling
techniques
Drill sample
recovery
Logging
Sub-sampling
techniques
and sample
preparation
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, tri
Share your feedback