Lode Advances Second High-Grade Antimony Project
Released
Released
Announcement PDF
ASX Announcement | 13 May 2025
ASX Code: LDR
LODE ADVANCES SECOND
HIGH-GRADE ANTIMONY PROJECT
Lode Resources Ltd (‘Lode’ or ‘Company’) (ASX: LDR) is pleased to announce the
advancement of significant exploration activity at the Magwood Antimony Project located in the
New England Fold Belt NSW, and together with the Montezuma Antinomy Project in Tasmania
forms a formidable antimony project portfolio.
Highlights
•
Drilling programme to commence at Magwood antimony project with all approvals in
place. The initial planned drill program for 15 diamond holes will test semi-parallel
lode structures as well as the historically mined lode from surface down to a depth of
450m.
•
The Magwood antimony mine has never been drilled despite being a significant
historical antimony producer and Australia’s largest primary antimony producer up to
the 1970’s with recorded yearly production grades ranging from 4% to 62% Sb.
Grab samples from mine dumps have returned up to 41.7% Sb and up to 6.14 g/t Au.
•
Multiple antimony bearing lodes have been identified through exploration mapping
and literature reviews. Historical mine plans show that only a single lode was
previously mined.
•
Magwood antimony mine dump grab samples assayed by Lode have returned
significant antimony grades including:
➢ 16.3% Sb, (sample no. R494)
➢ 12.9% Sb, (sample no. R501)
➢ 41.7% Sb, (sample no. R495)
➢ 29.9% Sb, (sample no. R504)
➢ 29.8% Sb, (sample no. R497)
➢ 15.8% Sb, (sample no. R513)
➢ 24.3% Sb, (sample no. R498)
➢ 17.8% Sb, (sample no. R514)
•
One dump sample graded 6.14 g/t Au (sample no. R508) indicating there is potential
for gold bearing lodes at depth.
•
Lode sees potential at the Magwood Antimony Project to drill test:
1. Sub-parallel antimony lode structures to Magwood mine working.
2. Unmined antimony mineralisation within Magwood mine workings.
3. Down dip/plunge extensions of the Magwood mine antimony lode at depth.
4. A potential dilation zone 700m northeast of the Magwood deposit.
•
Lode’s focus on antimony exploration is in alignment with the NSW Government
Critical Minerals and High-Tech Metals Strategy 2024–2035.
•
Drilling is ongoing at Lode’s Montezuma Antimony Project located in Tasmania’s
premier West Coast Mining Province. Samples from multiple completed drill holes are
currently being assayed at the ALS laboratory in Burnie.
Lode’s Managing Director Ted Leschke said: “The Magwood antimony mine is a highly
attractive drill target given it has not been drilled to date despite a history of significant antimony
production. Lode’s second antimony asset is just screaming out to be drilled. The geology of
the Magwood mine draws strong geological analogies with the Hillgrove antimony mine located
a short distance to the south. The Magwood and Montezuma Antimony Projects together form
a formidable antimony division within Lode”.
1
ASX Code: LDR | ACN: 637 512 415 | www.loderesources.com
A: Level 5, 1 Margaret St Sydney NSW 2000 | P: +61 2 9199 8017 | E: info@loderesources.com
Lode Executive Chair Andrew van Heyst said: “This is a very exciting time for Lode
shareholders. Your company is well positioned and fully funded for all planned operations. The
drilling at Montezuma is going very well and we have a great team in place to manage
operations there. Drilling is about to begin at Magwood where incredibly this historic antinomy
mine has never been drilled, nor has there been any prior reporting for gold. Shareholders can
look forward to a steady stream of news flow from both projects over the rest of the year. In
addition the team has been working on our high-grade silver project Webbs Consol. We look
forward to updating shareholders shortly about next steps and delivering a Maiden Resource
Estimate”.
Lode Advances Magwood Antimony Project1
Plans to commence an inaugural drilling programme at Lode’s 100% owned Magwood Antimony Project
are well advanced with all approvals in place. The Magwood Antimony Project is the company’s second
strategic antimony project and is located in the New England Fold Belt, NSW. A significant drill program
at Lode’s Montezuma Antimony Project located in Tasmania is on-going with samples from multiple
completed drill holes currently being assayed.
The planned Magwood Antimony Project drill program is for 15 diamond holes testing semi-parallel
antimony bearing lode structures at the Magwood antimony mine in addition to the one historical mined
lode. Drilling is designed to test targets ranging from shallow positions in depth to a likely down hole
depth of 450m.
The Magwood antimony mine has never been drilled despite being a significant historical antimony
producer and Australia’s largest primary antimony producer up to the 1970’s. The Magwood mine was
mainly worked between 1941 and 1970 with recorded yearly production grades ranging from 4% to
62% Sb and the first seven years of production average 55% Sb indicating very selective mining though
hand sorting of massive stibnite (71% Sb). Magwood was Australia’s largest primary antimony producer
before the focus switched to the Hillgrove mine in 1969. Multiple antimony bearing lodes have been
identified through exploration mapping and literature reviews. Historical mine plans and reports show
that only a single lode was previously mined.
Mine dump grab samples at the Magwood antimony mine have returned high grade antimony as
showing in Table 1 below. Grab sampling is selective in nature with resultant assay grades considered
to be qualitative rather than quantitative and not necessarily representative of the mined stibnite
mineralisation which may actually be lower or higher in antimony grade. Grab sample assays graded
as high as 41.7% Sb and one dump sample graded 6.14 g/t Au (sample no. R508) indicating there is
potential for gold bearing lodes at depth.
Table 1. Magwood mine dump grab samples antimony (Sb) and gold (Au) assays
Sample Easting Northing
Number
m
m
R494 420014 6656070
R495 420016 6656069
R496 420006 6656064
R497 420006 6656065
R498 420000 6656090
R499 420000 6656095
R500 420004 6656097
R501 420013 6656102
R502 420032 6656099
R503 420053 6656084
R504 420078 6656093
RL
m
1011
1002
1010
1004
1000
999
988
991
991
993
981
Sb
%
16.3
41.7
1.08
29.8
24.3
0.57
3.61
12.9
1.12
4.2
29.9
Au
g/t
0.11
0.04
0.01
0.04
0.12
0.01
0.12
0.11
0.11
<0.01
0.05
Sample Easting Northing
Number
m
m
R505 420080 6656101
R506 420047 6656055
R507 420047 6656049
R508 420044 6656033
R509 420019 6656079
R510 420023 6656105
R511 420086 6656090
R512 420090 6656101
R513 420081 6656084
R514 420071 6656074
R515 420016 6656079
RL
m
989
998
1000
1007
1000
994
990
978
993
995
1000
Sb
%
0.72
9.68
3.46
0.15
0.06
0.04
10.25
8.04
15.75
17.8
0.23
Au
g/t
0.13
0.05
0.01
6.14
0.04
0.01
0.03
0.05
0.03
0.04
0.01
2
Figure 1. Magwood antimony mine plan - grab sample location, semi-parallel lode structures, mine dumps and
underground mine levels projected to surface
Multiple Semi Parallel
Lode Structures
Magwood Main Shaft
300m depth
Photos 1 & 2. Drone borne photos of Adit 1 (80m depth) and Adit 3 (150m depth) underground workings
3
Figure 2. Magwood antimony mine longitudinal section - workings, stoped, potential unmined and down dip
extensions of mineralisation
SW
NE
Main
Shaft
Old
Shaft
Adit 1A
Adit 1
Potential Drill Target
300m
Adit 2
Potential Unmined
Pillars, Stockwork
Zones, Disseminated
Zones, Parallel Lodes
and Linkage Lodes
Adit 3
Potential Drill Target
Level 1 & Adit 4
1A
Level 2
Potential Drill Target
Level 3
Level 4
Potential Drill Target
Potential Down Plunge
Extension of Antimony
Mineralisation
Potential Drill Target
Possible Transition to Au
Rich Sb Mineralisation
at Depth
4
Lode sees potential at the Magwood Antimony Project to drill test:
1. Sub-parallel antimony bearing lode structures to Magwood mine workings. Multiple
antimony bearing lodes have been identified through exploration mapping and literature
reviews. At least two such subparallel lodes are recorded in historical maps and surface
mapping shows there are additional structures that have the potential be mineralised. It is
not unusual for subparallel or oblique (en echelon) lode structures to form a “stacked”
pattern where each lode is emplaced in a step like fashion in either the footwall, hanging
wall or both.
2. Unmined antimony mineralisation within Magwood mine workings. Unmined
mineralisation may now be considered economic grade in today’s terms considering the
significant rise in antimony prices and the advent of modern mining techniques. This
unmined mineralisation may be present as a dissemination halo, strike extensions of highgrade mineralisation and/or within mine pillars. Historical antimony production suggests
that the highest Sb grades were targeted and ore was hand-picked to further increase
head grade.
3. Down dip/plunge extensions of the Magwood mine antimony lode at depth. The
suggestion of a steepening of the structure controlling mineralisation is encouraging. A dip
reversal may develop if the dip of the structure over-steepens. Historical records suggest
that where the dip steepens antimony grades increase.
4. Potential dilation zone 700m northeast of the Magwood deposit. It is reported that
structure controlling mineralisation at Magwood can be traced >1,000m northeast. Whilst
the shear zone ranges from 1 to 7 metres in width, associated semi-parallel diorites and
lamprophyre dykes with associated minor pyritic mineralisation occur within a zone up to
9 metres wide. A zone of strong limonite and diorite outcrop has been reported 700 metres
northeast of Magwood – this is considered encouraging. A favoured lithology for higher
grade antimony mineralisation is where a shear zone cuts finer grain sediments such as
mudstone and siltstone.
Magwood Antimony Mine Detail
The historic Magwood Antimony Mine is located approximately 57km NE of Armidale and 46km NNE
of the Hillgrove antimony mine. Whilst the Magwood antimony mine was discovered in the 1880’s, the
mine was mainly worked between 1920 and 1970 and was Australia’s primary antimony producer
before the focus switched to the Hillgrove mine in 1969. Note that the Magwood mine has also been
referred to in historical literature as Magward, Magword and Fishington mine.
Magwood antimony mine mineralisation is mainly present as stibnite (Sb2S3) - quartz vein style lodes
emplaced in NE-SW structures bisecting interbedded mudstones and sandstones. The structurally
controlled high-grade antimony lodes typically are hosted in shear zones striking 035-050º and dip
steeply to the southeast. The Magwood antimony deposit is interpreted to be a localised bulge within a
regional shear. Historical mine plans show that only a single lode was previously mined.
Mining reached a depth of 300m below surface and it is believed that only the highest-grade
mineralisation was mined through highly selective “hand-picking”. Production records are erratic
however it is believed that the Magwood Antimony Mine produced ore at an average yearly grade
ranging from 4% to 61% Sb, a grade that is very-high by today’s standards. This may suggest that
significant unmined mineralisation remains within the mine at grades that would be considered to be
high-grade in today’s terms, especially given current high Sb prices.
5
From geological mapping at Magwood and observation of the rock samples seen in historical mine
dumps it is inferred that mineralisation is likely to be orogenic in origin and has typical characteristics of
most structurally controlled mesothermal deposits in the area, including the Hillgrove antimony mine.
Stibnite mineralisation observed in Magwood’s historical waste dumps occurs as massive lumps up to
20cm in size and as very coarse-grained stibnite/siltstone/quartz breccias. Stibnite mineralisation is
always associated with quartz veining and intense phyllic alteration of wall rock and breccia clasts. The
extent of the phyllic alteration zone is unknown but is thought to extend several metres beyond
mineralised shear zones.
The historically mine mineralised shear zone often contains a highly altered and deformed micro-granite
dyke that pre-dates mineralisation. The area surrounding the Magwood mine contains numerous altered
and unaltered dykes that all appear to strike at 35-55 degrees and range from 10cm to more than 10m
in width.
Based on observations of an exposed face at the collapsed Adit1A portal the historically mined shear
zone is 4m in width. The mineralised stibnite-quartz shear/breccia structure is approximately 1m wide
and positioned on the footwall contact. Based on rock sampling of historical waste dumps the highly
mineralised antimony samples contain very low arsenic levels.
Historical development plans and geological mapping show stibnite mineralisation was mined over a
strike length of 100-150m and down to a depth of 300m. Parallel or sub-parallel lodes occur within 50m
of the main Magwood mineralised zone. Two lodes called the Boundary Lode and the Old Shaft Lode
are shown on historical maps and mapped in the field. These lodes have not been significantly mined.
Photo 3. Magwood mine ore cart. Primitive historical mining
methods resulted in only the highest-grade antimony mineralisation
being mined and hand sorted
1
References
•
•
•
•
•
Geology of the new 1, 2, 3 and 4 levels, Magword Antimony Mine, Fishington (https://search.geoscience.nsw.gov.au/report/R00027702)
Magword Antimony Mine (Fishington) (https://search.geoscience.nsw.gov.au/report/R00042806)
Proposed programme for exploration in the near vicinity of Magword Antimony Mine, near Fishington (https://search.geoscience.nsw.gov.au/report/R00031043)
Industry 02: Mineral Industry NSW - 1970 – Antimony (https://search.geoscience.nsw.gov.au/report/R00050820)
New England Antimony Mine, Armidale (https://search.geoscience.nsw.gov.au/report/R00045720)
6
New England Antimony Exploration Licence
Lode’s New England exploration licences EL9662 and EL9319 cover multiple strategic antimony
prospects, including the historical Magwood antimony mine. These antimony prospects, together with
Lode’s Montezuma Antimony Project located in Tasmania, forms a strategic exploration portfolio that
is highly prospective for one of the world’s most critical metals.
In total there are 19 recorded antimony prospects within the Exploration Licences EL9662 and EL9319,
both controlled 100% by Lode. Almost no drilling has occurred within Lode’s antimony project areas
despite the geology being considered highly prospective for orogenic structurally-controlled antimony
mineralisation. It is highly relevant that surface work is almost nonexistent.
The area totals 1,914 km2 and forms a large proportion of the approximately 2,949km2 of exploration
licences that Lode owns in NSW. This makes Lode the largest holder of exploration ground in the New
England Fold Belt.
Exploration within the New England Fold Belt has been limited since the 1970’s with one exploration
hole drilled for every fourteen holes drilled in the Lachlan Fold Belt attesting to the tremendous discovery
potential that may be latent within Lode’s strategic exploration portfolio. Field activities have
commenced including access discussions with surface landowners.
Figure 1: Location of Lode’s EL9662 With Multiple Antimony Prosects
Lode’s EL9662
1,021 km2
Multiple Antimony
Prospects
7
About Lode Resources
Lode Resources is an ASX-listed explorer focused on the highly prospective but under-explored New
England Fold Belt in north-eastern NSW and the Montezuma Antimony Project located in Tasmania’s
premier West Coast Mining Province. The Company has assembled a portfolio of brownfield precious
and base metal assets characterised by:
•
•
•
•
100% ownership;
Significant historical geochemistry and/or geophysics;
Under-drilled and/or open-ended mineralisation; and
Demonstrated high-grade mineralisation and/or potential for large mineral occurrences.
This has resulted in a portfolio of assets with diverse mineralisation styles consisting of four core projects
of current focus
1. Uralla Gold – Located 8km west of the Uralla township, this goldfield was one of the earlier
goldfields discovered in NSW and a significant gold producer in the 1850’s. Despite this long
history the mineralisation style has only recently been recognised as being an Intrusive Related
Gold System (IRGS) and this has strong implications for this project’s discovery potential. Lode’s
holdings cover over 300 square kilometres.
2. Webbs Consol Silver – Located 16km west-southwest of Emmaville, this historic mining centre
is known for high-grade silver-base metal-bearing lodes that provide attractive targets that were
essentially drill-ready. Historical records of underground sampling indicated high-grade
mineralisation remains open at relative shallow depths and subsequent geophysical anomalies
were never followed up by drilling.
3. New England Antimony – Located in one of Australia’s most prolific antimony producing
provinces, 19 antimony prospects have already been identified within the Exploration Licences
EL9662 and EL9319, both controlled 100% by Lode. The project is anchored by the Magwood
Mine, discovered in the 1880s and mainly worked between 1941 and 1970, and was Australia’s
largest primary producer of antimony at the time.
4. Montezuma Antimony – Located on the west coast of Tasmania, a region well known for mining
activity. This project consists of a high-grade antimony-silver-lead deposit with initial
development, advanced metallurgical test work and significant beneficiation infrastructure.
This announcement has been approved and authorised by Lode Resource Ltd’s Managing
Director, Ted Leschke.
For more information on Lode Resources and to subscribe for our regular updates, please visit our
website at www.loderesources.com or email info@loderesoruces.com
No Material Changes
The Company confirms it is not aware of any new information or data that materially affects the
information included in these quarterly activities report and that all material assumptions and technical
parameters underpinning the exploration activities in this market announcements continue to apply and
have not materially changed.
Competent Person’s Statement
The information in this Report that relates to Exploration Results is based on information compiled by
Mr Jason Beckton, who is a Member of the Australian Institute of Geoscientists. Mr Beckton, who is
Executive Director – Resource Development at Lode Resources Ltd, has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Beckton has a
beneficial interest as a shareholder and an option holder of Lode Resources Ltd and consents to the
inclusion in this Report of the matters based on the information in the form and context in which it
appears.
8
Lode’s New England Project Locations
Webbs Consol
Silver
Sandon
Base Metals
NSW
New England
Antimony
Thor
Gold
Tea Tree
Gold
Uralla
Gold
Hillgrove
Gold & Antinomy
Fender
Copper/Zinc
Lode’s Tasmanian Project Locations
Montezuma West
Beneficiation Infrastructure
(2M-2018, 32M-1988, EL9-2019)
Montezuma East
Antimony-Silver Deposit
(2M-2023, EL7-2019)
9
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, Surface Mine Dump Rock Sampling
random chips, or specific specialised industry
• Surface samples were taken using a hammer.
standard measurement tools appropriate to the
• Samples were taken of high-grade mineralization.
minerals under investigation, such as down hole
• Samples were pulverized to 85% passing 75 microns at ALS Brisbane laboratory.
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
•
No new drilling was conducted.
10
Criteria
Drill sample
recovery
JORC Code explanation
•
•
•
Logging
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
Commentary
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
Method of recording and assessing core and chip • No new drilling was conducted.
sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples have been
• No new drilling was conducted.
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, • No new drilling was conducted.
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
11
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
JORC Code explanation
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have
been established.
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
Commentary
Surface Mine Dum Rock Sampling
•
•
•
Testing method was 4 acid digest with ICP scan for the major elements, Sb, Ag,
Cu, Pb, Zn.
Au was tested for using the fire assay method.
Due to the resistive nature of some Sb minerals to digestion all samples were
also tested using a XRF method for these element.
•
•
The assay data verified by the Project Manager.
The assay data has not been adjusted.
•
The positions of the rock samples were picked up using a hand-held GPS. The
accuracy of the coordinates is +- 4m.
12
Criteria
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
JORC Code explanation
•
•
•
•
•
•
•
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
The measures taken to ensure sample security.
Sample
security
•
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
Commentary
•
All locations are reported in GDA94 MGA Zone 56
.
• The data spacing and distribution is not currently sufficient for resource
estimation.
• No compositing has been applied to surface rock sampling
• The samples taken were spot samples of high-grade mine dump mineralization.
• All samples have been overseen by the Project Manager during transport from
site to the assay laboratories.
• No audits or reviews have yet been undertaken
13
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure
status
• Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
• Acknowledgment and appraisal of exploration by
other parties.
• The Magwood Project falls within EL9662.
• Lode Resources, through Lode Metals Pty Ltd, has a 100% interest in this
tenement.
Geology
• Deposit type, geological setting and style of
mineralisation.
• The Magwood antimony deposit is a structurally control lode hosted occurrence
within the Dyamberin Beds, a sedimentary package dominated by siltstones,
greywackes and sandstones. Antimony is present as stibnite (Sb2S3) an antimony
sulphide mineral. The source of the mineralising fluids is likely to be orogenic.
Drill hole
Information
• A summary of all information material to the
•
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material and
Exploration
done by
other parties
• The New England Antimony Mines (NEAM) company mined the Magwood lode
between 1950 to 1970.
No new drilling was conducted
14
Criteria
Data
aggregation
methods
JORC Code explanation
•
•
•
Relationship
between
mineralisatio
n widths and
intercept
lengths
•
Diagrams
•
•
•
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths of
low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (eg ‘down hole length, true width not
known’).
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional
views.
Commentary
• There has been no cut-off applied to the assay grades
• The samples taken were spot samples of high-grade mineralization
• Refer Figure 1.
15
Criteria
JORC Code explanation
Commentary
Balanced
reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemi
Share your feedback
Discover