Maiden Drilling Underway at Bundarra Copper-Zinc Project
Released
Released
Announcement PDF
ASX Announcement | 24 November 2026
ASX Code: LDR
1
ASX Code: LDR | ACN: 637 512 415 | www.loderesources.com
A: Suite 506, Level 5, 50 Clarence Street Sydney NSW 2000| P: +61 (2) 9078 7176 | E: info@loderesources.com
MAIDEN DRILLING UNDERWAY AT
BUNDARRA COPPER-ZINC PROSPECT
Highlights
• Drilling Underway: Lode’s maiden first-phase 18-hole drill programme is underway at
the Bundarra Copper-Zinc prospect, within the Company’s 100%-owned Sandon
Exploration Licence (EL9319) in the New England Fold Belt, NSW. This is Lode’s first
drill test of the historic Bundarra copper mine area.
• High-Grade Copper-Zinc-Silver Grab Samples: Grab samples from Bundarra mine
stockpiles returned significant copper, zinc and silver grades, indicating the high-grade
nature of the mineralisation historically mined, grab samples include:
4.31% Cu, 7.88% Zn & 35.2 g/t Ag
3.76% Cu, 5.36% Zn & 16.2 g/t Ag
2.56% Cu, 5.52% Zn & 11.7 g/t Ag
2.25% Cu, 8.60% Zn & 22.7 g/t Ag
• Untested Potential Around Historic Workings: Historic underground workings at
Bundarra extend to a vertical depth of approximately 75 metres and focused on a
single high-grade VMS band. Adjacent mineralisation has not been tested by near-
mine drilling, near-surface secondary mineralisation was ignored, and zinc was not
extracted as no market for zinc existed at the time. These untested opportunities are
the focus of the current drill programme.
• Multiple Targets: The drilling is designed to test four styles of copper-zinc
mineralisation associated with volcanogenic massive sulphide (VMS) deposits – near-
surface secondary mineralisation, footwall repetitions of the VMS lode, VMS feeder
zone mineralisation and syngenetic disseminated VMS mineralisation – so the
programme is not reliant on a single target concept.
• Broader Potential: Strike of over 2km with anomalous copper in soils located 1km to
the NNW and 1km to the SSE coinciding with gravity anomalies, providing follow-up
targets beyond the historic mine.
• Strategic Alignment: Lode’s exploration focus aligns with the NSW Government’s
Critical Minerals and High-Tech Metals Strategy 2024–2035 where copper is one of
five priority minerals and metals.
• Lode’s Managing Director Keith Mayes said: “We are excited about the
commencement of drilling at the Bundarra mine. Historic miners worked only a single
high-grade band to a shallow depth and recovered copper alone, leaving zinc
unrecovered and the surrounding mineralisation largely untested by drilling. The drill
programme is designed to test for multiple potential styles of copper-zinc
mineralisation associated with VMS style deposits thus maximising the chances of
success. Bundarra opens a new copper-zinc exploration front for Lode alongside our
antimony and silver projects. We look forward to announcing the first batch of drill
assay results in due course”.
2
Photos 1 & 2: Commencement of drilling at the Bundarra Copper-Zinc prospect
Maiden Drilling Underway at Bundarra Copper-Zinc Prospect
Lode Resources Ltd (‘Lode’ or the ‘Company’) (ASX: LDR) is pleased to announce it has commenced
drilling at the Bundarra Copper-Zinc prospect, part of its 100%-owned 800km2
Sandon Exploration
Licence (EL9319) located in the New England Fold Belt, NSW. The 18-hole programme is designed to
test for copper-zinc mineralisation in close proximity to the historical Bundarra copper mine, and is the
first drilling undertaken by Lode at the prospect.
3
Specifically, this first phase drill programme is designed to test multiple target styles including:
• Secondary copper-zinc mineralisation due to near surface weathering. These zones form close
to surface, where weathering can concentrate metals.
• Footwall repetitions of VMS copper-zinc lode mineralisation. These are potential additional
mineralised horizons in the footwall of (i.e. below) the band historically mined.
• Feeder zone copper-zinc mineralisation often associated with VMS style deposits. Feeder zones
are the pathways through which metal-bearing fluids rose to form the deposit.
• Syngenetic disseminated style VMS copper-zinc mineralisation contained within basalt and
chert horizons. Disseminated mineralisation is spread through the host rock rather than
concentrated in a single band.
Figure 1. Bundarra underground mine workings and current 18-hole planned drill
programme – southeast perspective
Copper was extracted from the Bundarra mine and processed through an onsite smelter during the
1890s and early 1900s. Although no production records are known to exist, mine plans show
underground mine workings extending to a vertical depth of approximately 75 metres. Mineral extraction
appears to have been solely focused on copper production whilst zinc was not extracted as evident by
an assay of slag where high-grade zinc remains – this is typical of mining during the late 1800s and
early 1900s period as a market for zinc did not exist. For Lode, this means zinc represents a potential
additional source of value that was not recovered by historic mining.
The mineralisation mined is believed to have developed syngenetically on a pyritic chert and metabasalt
contact which is typical for VMS deposits. Historically, mining focused primarily on this high-grade VMS
band whilst lower grade adjacent mineralisation was not mined. The high-grade nature of the
mineralisation mined is indicated by grab samples taken from surface waste stockpiles surrounding the
Bundarra mine. Note that grab sampling is a selective sampling technique and not necessarily
representative of in situ mineralisation which may be lower or higher in grade.
Table 1. Bundarra mine stockpile grab sample assays – copper (Cu), zinc (Zn) and silver (Ag)
Sample Easting Northing Cu Zn Ag
Number (m) (m) (%) (%) (g/t)
R640 313908 6656099 4.31 7.88 35.2 Massive sulphides
R641 313910 6656100 3.76 5.36 16.2 Massive sulphides with malachite
R331 313950 6656087 2.56 5.52 11.7 Massive sulphides
R660 313910 6656100 2.25 8.60 22.7 Massive sulphides
R639 313852 6656151 0.84 6.84 3.9 Smelter slag
Rock Type
Planned Drill Holes
Historical
Underground
Workings
4
Figure 2: Bundarra copper prospect - planned drill programme currently underway
Amoco Minerals Australia Company1,2,3,4
carried out extensive surface exploration over the Bundarra
Copper Project from 1976 to 1979, investigating the potential for volcanogenic massive copper-lead-
zinc sulphide deposits (VMS). Work carried out included geological mapping, soil sampling, various
geophysical techniques including aero magnetics, ground magnetics, gravity PEM and self-potential.
Extensive historic surface work means minimal preliminary work was needed for drill target definition,
allowing Lode to move efficiently to drill testing. Typical of the New England Fold Belt these projects
are highly prospective but very under-explored with only several drill holes recorded in the entire 800
km2
area.
Copper and zinc soil anomalies are located over the Bundarra mine area, where the anomalism is
amplified by mine contamination, and in locations at the southern and northern parts of the survey area.
A significant gravity anomaly coincides with the southern copper anomaly, and a weaker gravity
anomaly coincides with the northern copper anomaly. Coincident copper and gravity anomalies are of
interest because dense sulphide mineralisation, such as that found in VMS deposits, can produce a
gravity high. There is a distinct gravity low immediately to the east of the Bundarra mine which may be
reflective of alteration associated with a feeder zone. This gravity low east of the Bundarra mine
correlates with a magnetic low in state-wide magnetic data. Interestingly, there are several other large
unexplained magnetic lows in the wider Bundarra area that warrant further investigation.
Stockpile Grab Sample Assays
4.31% Cu, 7.88% Zn & 35.2 g/t Ag (R640)
3.76% Cu, 5.36% Zn & 16.2 g/t Ag (R641)
2.56% Cu, 5.52% Zn & 11.7 g/t Ag (R331)
2.25% Cu, 8.60% Zn & 22.7 g/t Ag (R660)
0.84% Cu, 6.84% Zn & 3.9 g/t Ag (R639)
5
Figure 3: Bundarra copper prospect – 2km strike of prospective lithology with anomalous copper in
soils and gravity highs located 1km to the NNW and 1km to the SSE
Area of Planned Drilling
shown in Figure 2
Anomalous copper in
soils & strong gravity high
Anomalous copper in
soils & gravity high
6
Next Steps
Drilling of the 18-hole first-phase RC drill programme is underway, and Lode looks forward to reporting
the first assay results in due course. The scope of any subsequent drill programme will depend on the
results of the current programme. Further geological mapping and surface sampling is also planned.
Bundarra Copper-Zinc Prospect References
1. Progress Report and Report for the Period October 1976 April 1977, Bundarra Project, EL931, NSW - Amoco Minerals Australia Company (R00011924)
2. Progress Report and Report for the Period April 1978 to October 1978, Bundarra Project, EL931, NSW - Amoco Minerals Australia Company (R00011680)
3. Progress Report and Report for the Period October 1977 to April 1978, Bundarra Project, EL931, NSW - Amoco Minerals Australia Company (R00016291)
4. Combined Final Report and Report for the Period October 1978 to April 1979, Bundarra Project, EL931, NSW - Amoco Minerals Australia Company (R00013107)
New England Exploration Licences – 1,900 km2
Lode’s New England exploration licences EL9662 and EL9319 cover multiple strategic antimony and
copper prospects, including Rock Abbey and Magwood. These antimony prospects, together with
Lode’s Montezuma and Silver Hills Antimony and Silver Projects located in Tasmania, form a strategic
exploration portfolio that is highly prospective for one of the world’s most critical metals. The Bundarra
Copper-Zinc prospect opens a new exploration front for Lode Resources. Lode’s exploration focus is in
alignment with the NSW Government’s Critical Minerals and High-Tech Metals Strategy 2024–2035
where copper is one of five priority minerals and metals.
In total, there are 19 recorded antimony prospects within the Exploration Licences EL9662 and EL9319,
both controlled 100% by Lode. Almost no drilling has previously occurred within Lode’s antimony project
areas despite the geology being considered highly prospective for orogenic structurally controlled
antimony mineralisation. It is highly relevant that modern exploration work is almost nonexistent.
Mineralisation ignored by historical artisanal miners may actually be quite significant in today’s terms
and exploration techniques such as systematic soil sampling may reveal mineralisation undercover.
The Bundarra Copper-Zinc prospect, whilst undergoing significant surface exploration work in the
1970s, has undergone limited drilling and further afield, exploration work is also almost nonexistent.
Exploration licences prospective for antimony cover an area of 1,900 km2
and forms a large proportion
of the approximately 2,700km2
of exploration licences that Lode owns in NSW. This makes Lode the
largest holder of exploration ground in the New England Fold Belt.
Exploration within the New England Fold Belt has been limited since the 1970s with one exploration
hole drilled for every fourteen holes drilled in the Lachlan Fold Belt highlighting the discovery potential
that may exist within Lode’s strategic exploration portfolio.
7
Figure 4: Location of Lode’s EL9662 & EL9319 Covering Multiple Antimony and Base Metal
Prospects
About Lode Resources
Lode Resources Ltd (LDR) is an ASX-listed explorer focused on the highly prospective but under-
explored New England Fold Belt in north-eastern NSW, and the Montezuma Silver & Antimony Project
in Tasmania’s premier West Coast Mining Province. The Company has assembled a portfolio of
brownfield precious and base metal assets characterised by:
• 100% ownership;
• Significant historical geochemistry and/or geophysics;
• Under-drilled and/or open-ended mineralisation; and
• Demonstrated high-grade mineralisation and/or potential for large mineral occurrences.
This has resulted in a portfolio of assets with diverse mineralisation styles, comprising six core projects
of current focus:
Montezuma Silver & Antimony Project – Located on the west coast of Tasmania, a region well known
for mining activity, the Project consists of a high-grade silver-antimony-lead resource with initial
development, advanced metallurgical test work and significant beneficiation infrastructure.
Uralla Gold – Located 8km west of the Uralla township, this goldfield was one of the earlier goldfields
discovered in NSW and a significant gold producer in the 1850’s. Despite this long history the
mineralisation style has only recently been recognised as being an Intrusive Related Gold System
(IRGS) and this has strong implications for this project’s discovery potential. Lode’s holdings cover over
300 square kilometres.
Lode’s EL9662 (1,100 km2
)
Multiple Sb prospects
Lode’s EL9319 (800 km2
)
Multiple Sb prospects & one base
metals prospect Magwood
Rock Abbey
Lode’s EL8980 (286 km2
)
Uralla Gold Project
Bundarra
8
New England Antimony Project– Located in one of Australia’s most prolific antimony producing
provinces, 19 antimony prospects have already been identified within the Exploration Licences (EL)
EL9662 and EL9319, both controlled 100% by Lode. The project is anchored by the Magwood Mine,
discovered in the 1880s and mainly worked between 1941 and 1970, and was Australia’s primary
producer of antimony.
Granville Tin Project – Located approximately 5 km west of Zeehan in Tasmania, this project is known
for its high-grade tin skarn mineralisation. Infrastructure includes connection to grid power, ball mill,
gravity tables, spirals, tankage, raw water and a recently constructed tailings dam.
Silver Hills Silver & Antimony Project – Located on the West Coast of Tasmania this Project
completely surrounds the historic Mt Bischoff Tin Mine and is highly prospective for high-grade silver–
antimony mineralisation such as that identified at the Silver Cliffs prospect and tin mineralisation at North
Valley Lodes
Sandon & Fender Copper Projects – Located in the New England Fold Belt with historical mine
production centred on the VMS style at the Bundarra and Trough Gulley copper-zinc mines. The
commencement of drilling at the Bundarra Copper-Zinc prospect opens a new exploration front for Lode
Resources.
Lode’s New England Project Locations
9
Lode’s Tasmanian Project Locations
10
This announcement has been approved and authorised by Lode Resources Ltd’s Managing
Director, Keith Mayes.
For more information on Lode Resources Ltd and to subscribe for our regular updates, please visit our
website at www.loderesources.com or email info@loderesources.com
Stay connected with Lode Resources
Scan the QR code to sign up for Lode’s investor updates and receive our latest ASX announcements
and project news straight to your inbox.
Scan now and sign up
No Material Changes
The Company confirms it is not aware of any new information or data that materially affects the
information included in this announcement and that all material assumptions and technical parameters
underpinning the exploration activities in this report continues to apply and have not materially changed
from announcements which have been referenced.
Competent Person’s Statements
The information in this Report that relates to Exploration Results for LDR’s NSW projects is based on information
compiled by Mr Mitch Tarrant, who is a Member of the Australian Institute of Geoscientists. The information in
this market announcement is an accurate representation of the available data for LDR’s NSW projects. Mr Tarrant,
who is an independent consultant geologist and project manager for LDR, has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Tarrant consents to the inclusion in
this Report of the matters based on the information in the form and context in which it appears.
The information in this Report that relates to Exploration Results for LDR’s Tasmanian projects is based on
information compiled by Mr Tim Callaghan, who is a Member of the Australian Institute of Geoscientists. The
information in this market announcement is an accurate representation of the available data for LDR’s Tasmanian
projects. Mr Callaghan, who is an independent consultant geologist, has sufficient experience which is relevant
to the styles of mineralisation and type of deposits under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Callaghan consents to the inclusion in this
announcement of the matters based on the information in the form and context in which it appears.
11
JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Surface Mine Stockpile Sampling
• Surface samples were taken using a hammer.
• Samples were taken of high-grade mineralization.
• Sampling techniques are considered appropriate for first pass qualitative
exploration.
• Samples were pulverized to 85% passing 75 microns at ALS Brisbane laboratory.
• Samples range in weight from 0.84 to 1.64kg.
Historical Soil Sampling
• Soil sampling was carried out over the Bundarra copper mine by Amoco Minerals
Australia Company and was reported in a Progress Report and Report for the
Period October 1976 April 1977, Bundarra Project, EL931, NSW (R00011924).
• This soil sampling predates the JORC Code and thus is classified as “historical”
under Chapter 05 of the ASX listing rules.
• LDR considers the historical soil sampling to be relevant in that soil sampling is a
common technique used to detect underlying mineralisation.
• LDR considers the data suitably reliable in that it is the contrast in soil sample
values over an area that assists with exploration drill target definition rather than
absolute values in isolation.
• Soil samples passing minus 80 mesh were taken from the “B” horizon on a 100m
x 20m grid. This spacing was reduced to a 50m x 20m grid in the vicinity of the
Bundarra mine and reduced further to 50m x 10m in the immediate vicinity of the
mine.
12
Criteria JORC Code explanation Commentary
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• No drilling was conducted by LDR prior to the commencement of drilling
announced in this report.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
• No drilling was conducted by LDR prior to the commencement of drilling
announced in this report.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• No drilling was conducted by LDR prior to the commencement of drilling
announced in this report.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• No drilling was conducted by LDR prior to the commencement of drilling
announced in this report.
13
Criteria JORC Code explanation Commentary
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have
been established.
Surface Mine Stockpile Sampling
• Testing method was 4 acid digest with ICP scan for major elements: Ag, Cu, Pb,
Zn.
• Au was tested for using the fire assay method.
Historical Soil Sampling
• Testing method was by A.A.S. (atomic absorption spectroscopy).
Verification
of sampling
and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Assay data was verified by the Project Manager and Executive Director.
• Assay data has not been adjusted.
• Commercial laboratory certificates and digital data were supplied by ALS
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• The positions of the rock samples were picked up using a hand-held GPS. The
accuracy of the coordinates is +- 4m.
• All locations are reported in GDA94 MGA Zone 56
• Please refer to Table 1 in the body of this report for sample location coordinates.
14
Criteria JORC Code explanation Commentary
• Quality and adequacy of topographic control.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The data spacing and distribution is of grab samples only as such is not currently
sufficient for resource estimation.
• No compositing has been applied to surface rock sampling
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
• The samples taken were spot samples of high-grade mine stockpile
mineralization.
Sample
security
• The measures taken to ensure sample security. • All samples have been overseen by the Project Manager during transport from
site to the assay laboratories.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• No audits or reviews have yet been undertaken
15
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
• Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
• The Bundarra prospect falls within EL9319.
• Lode Resources has a 100% interest in this tenement.
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by
other parties.
• The Amoco Minerals Australia Company carried out extensive surface exploration
over the Bundarra Copper Project from 1976 to 1979, investigating the potential
for volcanogenic massive copper-lead-zinc sulphide deposits (VMS). Work carried
out included geological mapping, soil sampling, various geophysical techniques
including aero magnetics, ground magnetics, gravity PEM and self-potential.
Reports by Amoco are referenced in the body of this report.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Bundarra copper-zinc prospect hosts volcanogenic massive sulphide (VMS)
style mineralisation. The mineralisation developed syngenetically along the
contact between pyritic chert and basalt, which is characteristic of submarine
volcanic-hosted VMS systems.
• The host Sandon Beds is a sedimentary sequence of folded marine rocks
including greywacke, mudstone, chert, argillite, conglomerate, and volcanics. The
age is Early Carboniferous within the broader New England Orogen tectonic belt.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
o dip and azimuth of the hole
• No drilling was conducted by LDR prior to the commencement of drilling
announced in this report.
16
Criteria JORC Code explanation Commentary
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
• Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths of
low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• There has been no cut-off applied to the assay grades
Relationship
between
mineralisatio
n widths and
intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (eg ‘down hole length, true width not
known’).
• The samples taken were spot samples of high-grade mineralization
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional
• Refer to Table 1 and Figure 2 in the body of this report for sample locations.
17
Criteria JORC Code explanation Commentary
views.
Balanced
reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
• All assay results have been reported for the Bundarra prospect.
• All exploration results discussed in this report are included in the tables and
figures associated with this report.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
– size and method of treatment; metallurgical test
res
Share your feedback
Discover