Montezuma Antimony Project Activities Commence
Released
Released
Announcement PDF
ASX Announcement | 9 December 2024
ASX Code: LDR
MONTEZUMA ANTIMONY PROJECT
DEVELOPMENT ACTIVITIES COMMENCE
Lode Resources Ltd (‘Lode’ or ‘Company’) (ASX: LDR) is pleased to announce development
activities have commenced at the recently acquired Montezuma Antimony Project located in
Tasmanian’s premier West Coast Mining Province.
Highlights
•
All core from previous drilling at the Montezuma Antimony Project has now been
relogged and resampled in accordance with JORC 2012 standards. More than
230 drill core samples from 13 drill holes have been shipped to ALS in Brisbane
for assaying.
•
Previous surface sampling and assaying has been fully reviewed and verified in
accordance to JORC 2012 standards. Surface grab samples grade up to 24.5%
antimony (Sb) & 3,050 g/t silver (Ag).
•
Previous exploration adit face sampling and assaying has been fully reviewed
and verified in accordance to JORC 2012 standards. Development face samples
grade up to 21.4% antimony (Sb) & 2,478 g/t silver (Ag).
•
Exploration drive development has recommenced with antimony mineralisation
selectively mined and stockpiled. Previously representative sampling of
mineralisation mined during adit box cut and portal development averaged
9.02% antimony (Sb) & 769 g/t silver (Ag) reconciling well with corresponding
face sampling.
•
A new drill programme is currently being designed with the aim of extending the
Montezuma antimony-silver-lead deposit mineralisation along strike and down
dip. The Montezuma deposit remains open to the north, south and at depth.
•
Antimony market tightens further with China announcing the ban on antimony
exports specifically to the United States on 3 December. This curb strengthens
the enforcement of existing limits on critical minerals exports by China
announced last year and the specific ban on certain antimony product exports
early this year.
•
The Tasmanian Government recently outlined a Critical Minerals Strategy which
includes the objective of growing exploration for critical minerals and support
critical minerals projects. Montezuma, 100% owned by Lode, is Tasmania’s only
antimony project.
ASX Code: LDR
|
ACN: 637 512 415
A: Level 5, 1 Margaret St Sydney NSW 2000
|
|
www.loderesources.com
P: +61 2 9199 8017
|
E: info@loderesources.com
Montezuma Antimony Project Development Activities Commence
Development activities have commenced at the recently acquired Montezuma Antimony Project. This
project includes a high-grade antimony-silver-lead deposit with initial development, advanced
metallurgical test work and significant beneficiation infrastructure. Access is via the Zeehan township
located 14km to the west.
The Montezuma antimony deposit (2M-2023, EL7-2019) is located between well-known mining centres
such as:
•
•
•
•
Rosebery (Zn,Cu,Pb) owned by MMG Ltd
Renison Bell (Sn) owed by Metals X Ltd and Yunnan Tin Group Company Limited
Henty (Au) owned by Catalyst Metals Ltd
Zeehan (Sn,Pb,Ag) owned by Stella Resources Limited.
Montezuma is Tasmania’s only antimony project. See page 8 of this announcement. Antimony is classified
as a critical metal by both the Australian Federal Government and the Tasmanian State Government, as
well as almost every advanced western nation.
Figure 1. Montezuma Antimony Project located in Tasmanian’s premier West Coast Mining Province
Several significant mining centres
surround LDR’s 100% owned
Montezuma Antimony Project
The Montezuma Antimony Project also includes significant beneficiation infrastructure located
15km to the northwest of the Zeehan township. Infrastructure includes connection to grid power,
cone crusher, ball mill, gravity tables, spirals, tankage, raw water and a recently constructed
tailings dam. Trial pilot scale beneficiation treatment of Montezuma mineralisation is planned once
metallurgical parameters, flowsheet configuration and permitting are finalised.
2
Diamond Drill Sampling
All core from previous drilling at the Montezuma Antimony Project has now been relogged, recut and
resampled in accordance with JORC 2012 standards. Remedial actions include precise logging and
precise sampling based on lithological and grade domains including halo mineralisation, and the inclusion
of standard and blank samples for quality control.
In excess of 230 drill core samples from 13 drill holes have been shipped to ALS in Brisbane for assaying.
All work concerning the relogging and resampling of previously drilled core (and verification of surface
grab and adit face sampling) has been carried out by Lode’s experienced geological team with significant
experience in structurally control late-stage hydrothermal mineralisation, specifically at the Hillgrove
antimony deposit in NSW.
Lode sees the potential for significant upside from previous pre-JORC logging and assaying through
more accurate XRF assay technique (previously ICP), separate sampling of discrete mineral domains (ie
high-grade vs low-grade vs wall rock halo mineralisation) and the assaying for other metals such as gold.
A new drill programme is currently being designed with the aim of extending the Montezuma antimonysilver-lead deposit mineralisation along strike and down dip. The Montezuma deposit remains open to
the north, south and at depth.
Lode now owns a diamond drill rig suitable for both surface and underground drilling – one of multiple
pieces of equipment recently acquired with the Montezuma Antimony Project.
Photos 1 & 2. Recutting, resampling and relogging core from previous drilling at Montezuma
Photo 3. Relogging drill core
Photo 4. Cut core samples prior to shipping to ALS in Brisbane
3
Surface Grab Sampling
Previous surface sampling and assaying has been fully reviewed and verified in accordance with JORC
2012 standards. Surface grab samples were taken from trenches perpendicular to strike and at 5m
intervals along a 50m exposure of the Montezuma antimony-silver-lead deposit. With reference also to the
cautionary statement above, surface samples have graded up to 24.5% antimony (Sb), 3,050 g/t silver
(Ag) and 39.1% lead (Pb).
These surface sample antimony (Sb) grades ranged from 4.36% to 24.50%, silver (Ag) grades ranged
from 124 g/t to 3,050 g/t and lead (Pb) grades ranged from 6.81% to 39.08%. Average grades are 11.9%
antimony (Sb), 843 g/t silver (Ag) and 18.0% lead (Pb).
Grab sampling is selective in nature with resultant assay grades considered to be qualitative rather than
quantitative and not necessarily representative of underlying mineralisation which may actually be lower
or higher in grade.
Table 1. Montezuma antimony-silver-lead deposit surface sample assays - taken at 5m intervals along a
50m strike traverse
Sample
Number
SGD+0
SGD+5
SGD+10
SGD+15
SGD+25
SGD+30
SGD+35
SGD+40
SGD+45
SGD+50
Average
Easting
m
373150.4
373150.1
373150.1
373149.7
373152.9
373154.1
373154.4
373154.1
373153.3
373152.5
Northing
m
5364151.0
5364155.5
5364160.5
5364165.2
5364172.7
5364176.9
5364181.8
5364186.8
5364191.7
5364196.5
RL
m
632.9
630.8
631.3
629.9
624.8
622.4
621.4
620.7
621.0
622.4
Sb
%
6.01
18.30
10.10
17.20
24.50
16.90
4.36
5.73
10.40
5.12
11.86
Ag
g/t
446
3,050
1,950
399
501
640
124
175
158
986
843
Pb
%
10.60
18.90
14.00
29.68
39.08
16.70
6.81
11.00
17.50
15.80
18.01
Figure 2. Montezuma antimony-silver-lead deposit - surface sample positions
4
Development Face Sampling
Previous exploration adit face sampling and assaying has been fully reviewed and verified in accordance
with JORC 2012 standards. Development of the portal box cut and exploration drive has commenced
with samples taken fromthree development faces up to the initial adit face, each representing a 2.4m cut
(drilled, charged,blasted, mineralised/waste rock removed and stockpiled).
Development face samples have graded up to 21.4% antimony (Sb), 2,478 g/t silver (Ag) and
44.3% lead (Pb). Antimony (Sb) grades ranged from 1.54% to 21.40%, lead (Pb) grades ranged
from 2.13% to 44.3% and silver (Ag) grades ranged from 93 g/t to 2,478 g/t.
Total interval grades for face sampling are 9.3% antimony (Sb), 306 g/t silver (Ag) and 16.7%
lead (Pb) over 1.85m for development face LT1, 7.8% antimony (Sb), 804 g/t silver (Ag) and
10.9% lead (Pb) over 2.20m for development face LT2 and 6.2% antimony (Sb), 301 g/t silver
(Ag) and 11.7% lead (Pb) over 2.00m for development face LT3.
Table 2. Montezuma antimony-silver-lead deposit – sampling of three development faces
Sample
Easting Northing
RL
Number
m
m
m
LT101
LT102
373154.2 5364182.0 620.0
LT103
LT1 Total Interval
LT201
LT202
373154.3 5364178.1 620.0
LT203
LT204
LT2 Total Interval
LT301
LT302
373154.0 5364176.3 620.3
LT303
LT3 Total Interval
From
m
0.00
0.50
1.45
0.00
0.00
0.50
1.10
1.60
0.00
0.00
0.30
0.50
0.00
To
m
0.50
1.45
1.85
1.85
0.50
1.10
1.60
2.20
2.20
0.30
0.50
2.00
2.00
Interval
m
0.50
0.95
0.40
1.85
0.50
0.60
0.50
0.60
2.20
0.30
0.20
1.50
2.00
Sb
%
17.50
3.07
13.90
9.31
18.65
5.90
6.78
1.54
7.81
13.65
21.40
2.66
6.18
Ag
g/t
434
186
431
306
2,478
346
534
93
804
1,170
462
106
301
Pb
%
34.00
5.26
22.40
16.73
25.80
8.49
9.21
2.13
10.85
21.00
44.30
5.51
11.71
Mined and Stockpiled Mineralisation
Exploration drive development has recommenced with antimony mineralisation selectively mined and
stockpiled. Previously representative sampling of mineralisation mined during adit box cut and portal
development averaged 4.75% antimony (Sb), 239 g/t silver (Ag) and 9.36% lead (Pb) for combined
mineralisation/waste batches and representative sampling averaged 9.02% antimony (Sb), 769 g/t
silver (Ag) and 15.47% lead (Pb) for mineralisation only batches which reconciles well with
corresponding face sampling – see LT1 Total Interval in Table 4.
Table 3. Combined development
mineralisation/waste assays
Sample
Number
DSO1 All in
DSO2 All in
DSO3 All in
DSO4 All in
Average
Sb
%
4.16
4.30
5.25
5.29
4.75
Ag
g/t
232
237
244
243
239
Table 4. Development mineralisation only assays
Pb
%
8.48
8.87
9.88
10.20
9.36
Sample
Number
DSO11/22 01
DSO11/22 02
DSO11/22 03
Average
Sb
%
7.96
9.01
10.10
9.02
Ag
g/t
917
672
718
769
Pb
%
12.85
16.30
17.25
15.47
5
Photo 5. Mined and coarsely crushed Montezuma mineralisation. Representative sample assays of
mineralisation only batches averaged 9.02% antimony (Sb), 769 g/t silver (Ag) and 15.47% lead (Pb)
Photo 6. Exploration drive development has recommenced
6
Figure 3. Plan view of Montezuma surface and box cut/adit sample positions and previously completed drill holes
with outstanding assay
SGD+50
SGD+45
MZP245A
SGD+40
LT1
SGD+35
LT2
SGD+30
LT3
SGD+25
SGD+20
MZS01
MZS02
MZS03
MZS04
SGD+15
SGD+10
MZSFW6
MZSFW5
SGD+5
MZSFW3
MZSFW4
MZSFW2
MZSFW1
MZSFW7
MZSFW8
KEY
SGD+0
Drill Collar
Grab Sample
Face Sample
Montezuma Structure
Drill Trace
7
Antimony - One of the World’s most strategic metals
Antimony is classified as a critical metal by both the Australian Federal Government and the
Tasmanian State Government, as well as almost every advanced western nation. Antimony
markets have tightened further with China announcing the ban on antimony exports specifically
to the United States on 3 December*. This curb strengthens the enforcement of existing limits
on critical minerals exported from China announced last year and the more specific ban on
certain antimony product exports early this year, all due to national security concerns. Antimony
prices have now reached record levels due to tight supply conditions.
The Tasman Government recently outlined a Critical Minerals Strategy which includes the
objective of growing exploration for critical minerals and supporting critical minerals projects.
Montezuma, 100% owned by Lode, is Tasmania’s only antimony project**.
Figure 4. Tasmania’s strategic minerals – Montezuma is Tasmania’s only antimony project,100% owned by
LDR
Montezuma Antimony Project
•
•
100% owned by LDR
Tasmania’s only antimony project
*https://www.reuters.com/markets/commodities/china-bans-exports-gallium-germanium-antimony-us-2024-12-03/
**https://mrt.tas.gov.au/__data/assets/pdf_file/0017/551114/Critical_Minerals_Strategy_23_Oct_2024.pdf
8
Montezuma Antimony Project
The Montezuma Antimony Project deposit (2M-2023, EL7-2019) is located between well-known mining
centres such as Rosebery (Zn,Cu,Pb), Renison Bell (Sn), Henty (Au) and Zeehan(Pb,Ag). Access is
via the Zeehan township located 14km to the west.
The Montezuma Antimony Project also includes beneficiation infrastructure located 15km to the
northwest of the Zeehan township and includes a cone crusher, ball mill, gravity tables, spirals, tankage,
connections to the power grid, raw water and a recently constructed tailings dam.
Figure 5. Montezuma Antimony Project located in Tasmanian’s premier West Coast Mining Province
The Montezuma antimony-silver-lead deposit is a structurally controlled lode, emplaced primarily within
the well-known Motezuma fault and hosted by a sequence of turbidites, siltstones and black shale units.
Antimony and lead are contained within Jamesonite, a lead-iron-antimony sulphide mineral
(Pb4FeSb6S14) and is a late-stage hydrothermal mineral forming at moderate to low temperatures.
Stibnite (Sb2S3) is also relatively abundant. This project is also prospective for gold, zinc, copper, tin
and tungsten.
9
This announcement has been approved and authorised by Lode Resource Ltd’s Managing
Director, Ted Leschke.
For more information on Lode Resources and to subscribe for our regular updates, please visit our
website at www.loderesources.com or email info@loderesoruces.com
No Material Changes
The Company confirms it is not aware of any new information or data that materially affects the
information included in this announcement and that all material assumptions and technical parameters
underpinning the exploration activities in this market announcementscontinue to apply and have not
materially changed.
Competent Person’s Statement
The information in this market announcement that relates to exploration results is based on information
compiled by Mr Jason Beckton, who is a Member of the Australian Institute of Geoscientists. The
information in this market announcement is an accurate representation of the available data for
Montezuma project. Mr Beckton, who is Executive Director – Resource Development at Lode, has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the 2012 edition of the ‘Australasian Code for Reporting of ExplorationResults, Mineral Resources and
Ore Reserves’. Mr Beckton has a beneficial interest as ashareholder and option holder of Lode and
consents to the inclusion in this announcementof the matters based on the information in the form and
context in which it appears.
Photo 7. Montezuma exploration drive heading marked-up and ready to be charged
10
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, Surface Grab Sampling
random chips, or specific specialised industry
• Surface samples were taken using a rock drill with a short steel for control. A
standard measurement tools appropriate to the
large 52mm reaming bit was used to ensure the drill chipped off samples and
minerals under investigation, such as down hole
didn't begin to collar.
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
• Samples were taken across the high-grade mineralisation from footwall to
limiting the broad meaning of sampling.
hanging wall at roughly 5m intervals along strike.
• Include reference to measures taken to ensure
• Samples were pulverized to 85% passing 75 microns at Core Resources
sample representivity and the appropriate
Laboratory.
calibration of any measurement tools or systems
Development Face Sampling
used.
• Aspects of the determination of mineralisation
• Chips grab samples were taken systematic and horizontally across the
that are Material to the Public Report.
development face of box cut and adit.
• In cases where ‘industry standard’ work has been
• Sampling intervales based on high, medium and low-grade domains.
done this would be relatively simple (eg ‘reverse
• Samples were pulverized to 85% passing 75 microns at Core Resources
circulation drilling was used to obtain 1 m
Laboratory.
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
Mined and Stockpiled Mineralisation Sampling
cases more explanation may be required, such
as where there is coarse gold that has inherent
• Representative sampling of combined mineralisation/waste batches and
sampling problems. Unusual commodities or
representative sampling of mineralisation only batches were taken by a blind
mineralisation types (eg submarine nodules) may
grab x 2 for every one tonne of coarsely crush rock contained in polyweave bulk
warrant disclosure of detailed information.
bags.
• The grab samples were placed in a drum which allowed mixing of the combined
samples.
• Blind samples were taken from this drum for analysis.
• Samples were pulverized to 85% passing 75 microns at Core Resources
11
Criteria
JORC Code explanation
Commentary
Laboratory.
Drilling
techniques
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
•
N/A
• N/A
• N/A
•
N/A
12
Criteria
JORC Code explanation
•
•
Quality of
assay data
and
laboratory
tests
•
•
•
Verification
of sampling
and
assaying
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have
been established.
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
Commentary
Surface Grab Sampling
•
Testing method was 4 acid digest with ICP scan for common elements in Ores,
Aqua Regia digest with ICP scan for high concentrations of As, Ge, Hg, Sb in
ores at the Core Resources Laboratory.
Development Face Sampling
•
Testing method was 4 acid digest with ICP scan for common elements in Ores,
Aqua Regia digest with ICP scan for high concentrations of As, Ge, Hg, Sb in
ores at the Core Resources Laboratory.
Mined and Stockpiled Mineralisation Sampling
•
Testing method was 4 acid digest with ICP scan for common elements in Ores,
Aqua Regia digest with ICP scan for high concentrations of As, Ge, Hg, Sb in
ores at the Core Resources Laboratory.
•
N/A
13
Criteria
JORC Code explanation
Commentary
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
• The measures taken to ensure sample security.
• The face sampling intervals range from 0.2m to 1.5m in width.
• The data spacing and distribution is not currently sufficient for resource
estimation.
• No compositing has been applied to surface grab sampling and development face
sampling. Representative sampling of stockpile mineralisation was composited.
• The results of any audits or reviews of sampling
techniques and data.
• No audits or reviews have yet been undertaken
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
•
•
A permanent base station was established with RTK GPS central to the project
area using GDA94.
All surface grab and development sampling positions where surveyed using a
total station.
All locations are reported in GDA94 MGA Zone 55
.
• Development face sampling was conducted perpendicular to the line of lode.
• All Spero samples have been overseen by the Project Manager during transport
from site to the assay laboratories.
Section 2 Reporting of Exploration Results
14
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure
status
• Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
• Acknowledgment and appraisal of exploration by
other parties.
• The Montezuma Project contains two tenements EL7/2019 and 2M/2023
• The Granville Project contains 3 tenements EL9/2019, 2M/2018 & 32M/1988
• Lode Resources, through Spero and related entities and parties, have a 100%
interest in these tenements
Geology
• Deposit type, geological setting and style of
mineralisation.
• The Montezuma antimony-silver-lead deposit is a structurally control lode
emplaced primarily within the well-known Montezuma fault and hosted by a
sequence of turbidites, siltstones and black shale units. Antimony is present as
Jamesonite, a lead-iron-antimony sulphide mineral (Pb 4FeSb6S14) and as stibnite
(Sb2S3) an antimony sulphide mineral. Lead is present in the Jamesonite.
Jamesonite is a late-stage hydrothermal mineral forming at moderate to low
temperatures. Silver is primarily present as tetrahedrite.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
• All surface grab and development sampling positions are tabulated in the body of
this announcement.
Exploration
done by
other parties
• Electrolytic Zinc Company (EZ) discovered Montezuma while exploring for tin. EZ
completed 2 diamond holes including MZP245a that intersected the
Antimony/Silver/Lead mineralisation in 1983.
• The Montezuma antimony-silver-lead deposit is defined by Spero (now 100%
owned by Lode Resources) that undertook surface sampling of the exposed
mineralised structure over 50m strike length, development face sampling as
outlined in this announcement and 12 diamond drill holes which have intercepted
high-grade mineralisation down to a depth of 80m and are current be verified
though Recutting, resampling and relogging outlined in this announcement.
• The Montezuma antimony-silver-lead deposit remains open to the north, south
and at depth.
15
Criteria
JORC Code explanation
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisatio
n widths and
intercept
lengths
•
•
•
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths of
low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (eg ‘down hole length, true width not
known’).
Commentary
• For the Spero results there has been no cut-off applied to the assay grades
• The zone of high-grade mineralisation for each Spero diamond hole has been
composited into one sample
• N/A
16
Criteria
JORC Code explanation
Commentary
Diagrams
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional
views.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
– size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
• Refer Figures 2 and 3.
• The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
• Beside underground development and drilling, initial assessment work is being
carried out to determine the best approach to define deposit extensions as well as
Balanced
reporting
Other
substantive
exploration
data
Further work
• All analysis has been reported. Refer tables 1,2,3,4
• Development of portal box cut and exploration drive has commenced with
samples taken from three development faces up to the initial adit face, each
representing a 2.4m mining cut (refer Table 2)
• Development of a portal box cut and the commencement of an exploration drive
has produced stockpiled mineralisation. Representative sampling of a combined
mineralisation/waste batch and a mineralisation only batch (Refer tables 6&7)
• Core Resources has completed flowsheet design, test work and engineering
plans for the Montezuma Antimony Project. This work has involved developing an
innovative approach to recovering antimony from Jamesonite, whilst recovering
silver and lead by-products in a low-cost and straightforward process flowsheet
that could be implemented on site using readily available equipment
• Metallurgical test work on a batch of development mineralisation involved bulk
leaching, hydrocycloning remaining solids to produce a separate a Pb/Ag product,
oxidation, crystallization and precipitation of an antimony compound with a 90%
antimony recovery and 47% antimony content by weight was achieved. The
resultant product sodium pyroantimonate (Na 4Sb2O7) is primarily used as a glass
clarifier
• Further metallurgical work is needed to determine silver and lead recoveries,
however high-grade concentrate grading 2,575 g/t Ag and 60% Pb has already
been achieved.
17
Criteria
JORC Code explanation
large-scale step-out drillin
Share your feedback
Discover