Drilling Confirms Broad Gold Mineralisation - Uralla Project
Released
Released
Announcement PDF
ASX Announcement | 1 Jul 2026
ASX Code: LDR
1
ONGOING RC DRILLING CONFIRMS BROAD GOLD
MINERALISATION ACROSS MULTIPLE PROSPECTS AT THE
URALLA GOLD PROJECT, NSW
Highlights
• Lode’s 100% owned Uralla Gold Project, covering over 300 km² of the historic
Uralla Goldfield in NSW's New England Fold Belt, is emerging as a significant
Intrusive Related Gold System (IRGS) — a mineralisation style associated with
large-tonnage gold deposits globally.
• Recent follow-up scout RC drilling at Uralla has returned 23 new gold
mineralisation intercepts across multiple prospects, confirming broad zones of
near-surface gold mineralisation and supporting the emerging IRGS model,
including:
Drill hole KTN018 intercepted 9.0 metres @ 1.00g/t Au
Drill hole KTN023 intercepted 17.0 metres @ 0.46 g/t Au
- including 3.0 metres @ 2.11 g/t Au
Drill hole KTN027A intercepted 3.0 metres @ 3.35 g/t Au
Drill hole KTN025 intercepted 4.0 metres @ 1.51 g/t Au
Drill hole KTN021 intercepted 10.0 metres @ 0.57 g/t Au
- including 5.0 metres @ 1.00 g/t Au
Drill hole KTN17 intercepted 12.0 metres @ 0.43 g/t Au
- including 2.0 metres @ 1.55 g/t Au
Drill hole KTN31A intercepted 5.0 metres @ 1.02 g/t Au
Drill hole KTN26A intercepted 16.0 metres @ 0.72 g/t Au
- including 1.0 metres @ 3.19 g/t Au
• Previously reported intercepts include:
Drill hole KTN010 intercepted 15.0m @ 2.09g/t Au from 12m
- including 7.0 metres @ 3.65 g/t Au
Drill hole KTN007 intercepted 14.0m @ 1.24 g/t Au from 68m
- including 3.0 metres @ 2.21 g/t Au
Drill hole KTN005 intercepted 10.0m @ 1.32g/t Au from 9m
- including 5.0 metres @ 2.49 g/t Au
Drill hole KTN006 intercepted 16.0m @ 0.79g/t Au from 10m
- including 4.0 metres @ 1.59 g/t Au
Drill hole KTN011 intercepted 5.0m @ 1.04 g/t Au from 16m
Gold mineralisation defined across multiple near-surface lodes forms a large
circular geophysical feature consistent with a mineralised intrusive stock at depth
(a major defining characteristic of an IRGS system) and a strong indicator of large-
tonnage potential at Uralla.
Lode’s Managing Director Keith Mayes said: “These results continue to build a compelling picture at
Uralla. We are systematically defining gold-bearing lodes at surface while the exploration data points
to a potentially large mineralised intrusive body at depth, which is exactly what you'd expect to see
developing in a genuine IRGS system.
Every drill hole is adding to our understanding of the system's scale and the consistency of results
across multiple prospects gives us real confidence as we plan the next phase of work."
2
Lode Resources Ltd (‘Lode’ or ‘Company’) (ASX: LDR) is pleased to report new exploration drilling
results from it’s 100% owned Uralla Gold Project, located in the New England Fold Belt, in northern
NSW. Lode’s exploration licenses cover over 300 km2
which is substantially the footprint of the historic
Uralla Goldfield, one of NSW's earliest and most productive gold-producing regions.
Uralla Gold Project – Advancing an Intrusive Related Gold System
Intrusive Related Gold System (IRGS) deposits are characterised by broad, disseminated gold
mineralisation, breccias and stockworks hosted in and around intrusive bodies. A style associated with
large-tonnage gold deposits globally that are mined and processed at attractive economies of scale.
IRGS deposits are often represented at surface by vein lode style mineralisation as defined to date at
Uralla. Lode’s systematic exploration program continues to deliver gold drill intercepts, adding further
technical confirmation of this system type,
Each follow up RC drill result from Uralla has returned additional gold intercepts, consistently associated
with the structural and lithological features diagnostic of IRGS — including proximity to the Dyke Lode,
Little Dyke Lode and Red Gum Lode prospects. Please see Tabe 1 and Figures 1, 2 & 3.
Table 1. Recent follow-up scout RC drill results from the Uralla Gold Project
Hole Fom To Interval Au Endowment
Number (m) (m) (m) (g/t) (g/t.m)
KTN018 24.0 33.0 9.0 1.00 9.02
incl. 5.0 7.0 2.0 1.32
KTN023 26.0 43.0 17.0 0.46 7.86
incl. 5.0 7.0 2.0 1.32
incl. 5.0 7.0 2.0 1.32
KTN027A 30.0 32.0 2.0 3.35 6.69
KTN025 16.0 20.0 4.0 1.51 6.03
incl. 5.0 7.0 2.0 1.32
KTN021 27.0 37.0 10.0 0.57 5.69
incl. 5.0 7.0 2.0 1.32
KTN017A 38.0 50.0 12.0 0.43 5.12
KTN031A 20.0 25.0 5.0 1.02 5.12
KTN026A 58.0 64.0 6.0 0.72 4.33
incl. 5.0 7.0 2.0 1.32
KTN017B 46.0 50.0 4.0 0.90 3.59
incl. 5.0 7.0 2.0 1.32
KTN036 7.0 18.0 11.0 0.31 3.46
incl. 5.0 7.0 2.0 1.32
KTN027B 64.0 69.0 5.0 0.50 2.52
KTN030 74.0 80.0 6.0 0.41 2.45
KTN019 54.0 66.0 12.0 0.19 2.28
KTN031B 47.0 52.0 5.0 0.42 2.10
KTN028 39.0 46.0 7.0 0.29 2.03
KTN033 22.0 26.0 4.0 0.36 1.44
KTN044 43.0 46.0 3.0 0.45 1.35
KTN022 33.0 35.0 2.0 0.57 1.13
KTN043 22.0 25.0 3.0 0.35 1.05
KTN032 1.0 3.0 2.0 0.52 1.03
KTN026B 75.0 77.0 2.0 0.49 0.97
KTN034 34.0 37.0 3.0 0.32 0.97
KTN041 32.0 34.0 2.0 0.38 0.75
3
Previously reported intercepts from scout RC drilling at LDR’s Uralla Gold Project are shown in Table 2.
Table 2. Previous scout RC drill results from the Uralla Gold Project1-8
Figure 1. Plan view of scout RC drill results at the Dyke Lode prospect – new results are shown in bold font
Hole Fom To Interval Au Endowment
Number (m) (m) (m) (g/t) (g/t.m)
KTN001 5.0 12.0 7.0 0.65 4.54
incl. 5.0 7.0 2.0 1.32
KTN002 19.0 23.0 4.0 0.33 1.32
KTN003 9.0 14.0 5.0 0.42 2.12
KTN004 7.0 16.0 9.0 0.20 1.84
KTN005 9.0 19.0 10.0 1.32 13.15
incl. 9.0 14.0 5.0 2.49
KTN006 10.0 26.0 16.0 0.79 12.58
incl. 10.0 19.0 9.0 0.94
incl. 10.0 14.0 4.0 1.59
KTN007A 68.0 82.0 14.0 1.24 17.29
incl. 77.0 80.0 3.0 2.21
KTN007B 96.0 100.0 4.0 0.76 3.03
KTN010 12.0 27.0 15.0 2.09 31.38
incl. 15.0 22.0 7.0 3.65
incl. 16.0 18.0 2.0 5.83
KTN011 11.0 16.0 5.0 1.04 5.19
KTN012A 39.0 45.0 6.0 0.75 4.47
incl. 43.0 45.0 2.0 1.70
KTN012B 57.0 59.0 2.0 0.51 1.02
KTN013 106.0 111.4 5.4 0.58 3.11
incl. 110.0 111.4 1.4 1.72
KTN015 137.3 138.5 1.2 0.22 0.26
KTN021: 10.0m @ 0.57 g/t Au
Incl. 5.0m @ 1.00 g/t Au
KTN011: 5.0m @ 1.04 g/t Au
KTN004: 10.0m @ 0.57 g/t Au
Incl. 10.0m @ 0.57 g/t Au
KTN018: 9.0m @ 1.00 g/t Au
Incl. 2.0m @ 1.92 g/t Au
KTN012: 6m @ 0.75 g/t Au
Incl. 2.0m @ 1.75 g/t Au
KTN013: 5.4m @ 0.58 g/t Au
Incl. 1.4 m @ 1.72 g/t Au
KTN017: 12.0m @ 0.43 g/t Au
And 3.0m @ 0.90 g/t Au
KTN010: 15.0m @ 2.09 g/t Au
Incl. 7.0m @ 3.65 g/t Au
Incl. 2.0m @5.83 g/t Au
4
Figure 2. Plan view of scout RC drill results at the Red Gum Lode prospect – new results are shown in bold font
To date shallow scout drilling has delineated vein style mineralisation where dilations along structures
and associated felsic dykes hosts gold mineralisation. This style of mineralisation has the potential to
generate medium size gold deposits.
This vein style mineralisation together with several geochemical gold anomalies defined by deep soil
augur sampling (as previous reported1-8
) forms a broad circular feature which possibly represents a
mineralised intrusive stock at depth and potentially the source of the gold mineralisation. See figures 3,
4 & 5.
Also supporting this mineralised intrusive stock at depth hypothesis is the zonation of pathfinder
elements, particularly antimony. Antimony mineralisation is typically deposited at greater distances to
the heat source of a mineralised intrusive pluton. This outer zonation is reflected in the geochemical
antimony anomalism being more intense along structures radiating outward from the circular feature —
a pattern consistent with an IRGS system.
Blind plutons can act as both the source of gold bearing fluids for vein-style mineralisation and as the
hosts for gold mineralisation within and along their boundaries. The area at top of the pluton is known
as a cupola structure where exsolved fluids accumulate in the apex and shoulder wall rock of the pluton.
It is this style of mineralisation, more directly related to the pluton itself that has the potential to generate
large deposits. The more intense fracturing, focused fluid emplacement and greater volumes of rock
affected by the mineralising process, relative to discrete vein systems — underpin the large-tonnage
potential of this deposit model. Gold mineralisation can be present simultaneously in breccias,
stockworks and disseminations with both intrusive rock and country rock. See Figure 5.
The interpreted circular feature potentially reflection an intrusive stock at the Uralla gold project has the
dimensions of 400m x 350m.
KTN021: 10.0m @ 0.57 g/t Au
Incl. 5.0m @ 1.00 g/t Au
KTN011: 6.0m @ 0.41 g/t Au
KTN026: 6.0m @ 0.72 g/t Au
Incl. 1.0m @ 3.19 g/t Au
And 2.0m @ 0.49 g/t Au
KTN027: 2.0m @ 3.5 g/t Au
And 5.0 @ 0.50 g/t Au
KTN007: 14.0m @ 1.24 g/t Au
Incl. 1.0m @ 3.21g/t Au
And 4.0m @ 0.76 g/t Au
KTN006: 16.0m @ 0.79 g/t Au
Incl. 9.0m @ 0.94 g/t Au
Incl. 4.0m @ 1.59 g/t Au
KTN005: 10.0m @ 1.32 g/t Au
Incl. 5.0m @ 2.49 g/t Au
KTN028: 7.0m @ 0.29 g/t Au
Incl. 5.0m @ 1.00 g/t Au
5
Figure 3. Plan view of scout drill results at the Uralla Gold Project – new results in bold font. Background shows
previously reported gold assay grided image and contouring of 1,192 auger drill holes
Red Gum Lode Prospect
Hole Fom To Interval Au
Number (m) (m) (m) (g/t)
KTN005 9.0 19.0 10.0 1.32
incl. 9.0 14.0 5.0 2.49
KTN006 10.0 26.0 16.0 0.79
incl. 10.0 19.0 9.0 0.94
incl. 10.0 14.0 4.0 1.59
KTN007A 68.0 82.0 14.0 1.24
incl. 77.0 80.0 3.0 2.21
KTN007B 96.0 100.0 4.0 0.76
KTN026A 58.0 64.0 6.0 0.72
incl. 63.0 64.0 1.0 3.19
KTN026B 75.0 77.0 2.0 0.49
KTN027A 30.0 32.0 2.0 3.35
KTN027B 64.0 69.0 5.0 0.50
KTN028 39.0 46.0 7.0 0.29
KTN030 74.0 80.0 6.0 0.41
KTN031A 20.0 25.0 5.0 1.02
KTN031B 47.0 52.0 5.0 0.42
KTN032 1.0 3.0 2.0 0.52
Dyke Lode Prospect
Hole Fom To Interval Au
Number (m) (m) (m) (g/t)
KTN003 9.0 14.0 5.0 0.42
KTN004 7.0 16.0 9.0 0.20
KTN010 12.0 27.0 15.0 2.09
incl. 15.0 22.0 7.0 3.65
incl. 16.0 18.0 2.0 5.83
KTN011 11.0 16.0 5.0 1.04
KTN012A 39.0 45.0 6.0 0.75
incl. 43.0 45.0 2.0 1.70
KTN012B 57.0 59.0 2.0 0.51
KTN013 106.0 111.4 5.4 0.58
incl. 110.0 111.4 1.4 1.72
KTN017A 38.0 50.0 12.0 0.43
KTN017B 46.0 50.0 4.0 0.90
incl. 46.0 48.0 2.0 1.55
KTN018 24.0 33.0 9.0 1.00
incl. 31.0 33.0 2.0 1.92
KTN019 54.0 66.0 12.0 0.19
KTN021 27.0 37.0 10.0 0.57
incl. 32.0 37.0 5.0 1.00
Little Gracie Lode Prospect
Hole Fom To Interval Au
Number (m) (m) (m) (g/t)
KTN025 16.0 20.0 4.0 1.51
KTN033 22.0 26.0 4.0 0.36
KTN034 34.0 37.0 3.0 0.32
Little Dyke Prospect
Hole Fom To Interval Au
Number (m) (m) (m) (g/t)
KTN022 33.0 35.0 2.0 0.57
KTN023 26.0 43.0 17.0 0.46
incl. 26.0 32.0 6.0 1.22
incl. 28.0 31.0 3.0 2.11
Circular feature potentially
representing an intrusive
stock at depth
6
Figure 4. Plan view of scout drill results at the Uralla Gold Project – new results in bold font. Background shows
previously reported antimony assay data and contouring of 1,192 auger drill holes
Red Gum Lode Prospect
Hole Fom To Interval Au
Number (m) (m) (m) (g/t)
KTN005 9.0 19.0 10.0 1.32
incl. 9.0 14.0 5.0 2.49
KTN006 10.0 26.0 16.0 0.79
incl. 10.0 19.0 9.0 0.94
incl. 10.0 14.0 4.0 1.59
KTN007A 68.0 82.0 14.0 1.24
incl. 77.0 80.0 3.0 2.21
KTN007B 96.0 100.0 4.0 0.76
KTN026A 58.0 64.0 6.0 0.72
incl. 63.0 64.0 1.0 3.19
KTN026B 75.0 77.0 2.0 0.49
KTN027A 30.0 32.0 2.0 3.35
KTN027B 64.0 69.0 5.0 0.50
KTN028 39.0 46.0 7.0 0.29
KTN030 74.0 80.0 6.0 0.41
KTN031A 20.0 25.0 5.0 1.02
KTN031B 47.0 52.0 5.0 0.42
KTN032 1.0 3.0 2.0 0.52
Dyke Lode Prospect
Hole Fom To Interval Au
Number (m) (m) (m) (g/t)
KTN003 9.0 14.0 5.0 0.42
KTN004 7.0 16.0 9.0 0.20
KTN010 12.0 27.0 15.0 2.09
incl. 15.0 22.0 7.0 3.65
incl. 16.0 18.0 2.0 5.83
KTN011 11.0 16.0 5.0 1.04
KTN012A 39.0 45.0 6.0 0.75
incl. 43.0 45.0 2.0 1.70
KTN012B 57.0 59.0 2.0 0.51
KTN013 106.0 111.4 5.4 0.58
incl. 110.0 111.4 1.4 1.72
KTN017A 38.0 50.0 12.0 0.43
KTN017B 46.0 50.0 4.0 0.90
incl. 46.0 48.0 2.0 1.55
KTN018 24.0 33.0 9.0 1.00
incl. 31.0 33.0 2.0 1.92
KTN019 54.0 66.0 12.0 0.19
KTN021 27.0 37.0 10.0 0.57
incl. 32.0 37.0 5.0 1.00
Little Gracie Lode Prospect
Hole Fom To Interval Au
Number (m) (m) (m) (g/t)
KTN025 16.0 20.0 4.0 1.51
KTN033 22.0 26.0 4.0 0.36
KTN034 34.0 37.0 3.0 0.32
Little Dyke Prospect
Hole Fom To Interval Au
Number (m) (m) (m) (g/t)
KTN022 33.0 35.0 2.0 0.57
KTN023 26.0 43.0 17.0 0.46
incl. 26.0 32.0 6.0 1.22
incl. 28.0 31.0 3.0 2.11
Circular feature potentially
representing an intrusive
stock at depth
7
Figure 5. Potential mineralisation model for the Uralla Gold Project with two styles of gold mineralisation
emplacement shown.
Gold mineralisation in
associated veins and
pipes – medium deposit
potential
Dyke Lode, Red Gum
Lode, Little Gracie Lode,
etc.
Gold mineralisation
associated intrusive
cupola structures –
large deposit potential
Future exploration
target
8
About Lode Resources
Lode Resources Ltd (LDR) is an ASX-listed explorer focused on the highly prospective but under-
explored New England Fold Belt in north-eastern NSW and the Montezuma Silver & Antimony Project
located in Tasmanian’s premier West Coast Mining Province. The Company has assembled a portfolio
of brownfield precious and base metal assets characterised by:
• 100% ownership;
• Significant historical geochemistry and/or geophysics;
• Under-drilled and/or open-ended mineralisation; and
• Demonstrated high-grade mineralisation and/or potential for large mineral occurrences.
This has resulted in a portfolio of assets with diverse mineralisation styles consisting of four core
projects of current focus.
Montezuma Silver & Antimony Project – Located on the west coast of Tasmania, a region well known
for mining activity, the Project consists of a high-grade antimony-silver-lead deposit with initial
development, advanced metallurgical test work and significant beneficiation infrastructure.
Uralla Gold – Located 8km west of the Uralla township, this goldfield was one of the earlier goldfields
discovered in NSW and a significant gold producer in the 1850’s. Despite this long history the
mineralisation style has only recently been recognised as being an Intrusive Related Gold System
(IRGS) and this has strong implications for this project’s discovery potential. Lode’s holdings cover over
300 square kilometres.
New England Antimony Project – Located in one of Australia’s most prolific antimony producing
provinces, 19 antimony prospects have already been identified within the Exploration Licences (EL)
EL9662 and EL9319, both controlled 100% by Lode. The project is anchored by the Magwood Mine,
discovered in the 1880s and mainly worked between 1941 and 1970, and was Australia’s primary
producer of antimony.
Granville Tin Project – Located approximately 5 km west of Zeehan in Tasmania, this project is known
for its high-grade tin skarn mineralisation. Infrastructure includes connection to grid power, ball mill,
gravity tables, spirals, tankage, raw water and a recently constructed tailings dam.
Silver Hills Silver & Antimony Project – Located on the West Coast of Tasmania this Project
completely surrounds the historic Mt Bischoff Mine and is high prospective for high-grade silver–
antimony mineralisation such as that identified at the Silver Cliffs prospect.
Lode’s New England Project Locations
NSW
Twin Hills
Gold & Silver
Mt Carrington
Gold & Silver
Timbarra
Gold & Silver
Hillgrove
Gold &
Antinomy
Webbs
Silver
Rocky River
Gold
Fender
Copper/Zinc
Uralla
Gold
Tea Tree
Gold
Thor
Gold
Sandon
Antimony
New England
Antimony
Webbs Consol
Silver
9
Lode’s Tasmanian Project Locations
This announcement has been approved and authorised by Lode Resource Ltd.’s Managing Director,
Keith Mayes.
For more information on Lode Resources and to subscribe for our regular updates, please visit our website
at www.loderesources.com or email info@loderesoruces.com
No Material Changes
The Company confirms it is not aware of any new information or data that materially affects the information
included in this announcement and that all material assumptions and technical parameters underpinning the
exploration activities in this market announcementscontinue to apply and have not materially changed.
Competent Person’s Statement
The information in this Report that relates to Exploration Results for LDR’s NSW projects is based on information
compiled by Mr Mitch Tarrant, who is a Member of the Australian Institute of Geoscientists. Mr Tarrant, who is a
consultant geologist and project manager for LDR, has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Tarrant consents to the inclusion in this Report of the matters based
on the information in the form and context in which it appears.
10
Appendix I
Drill Hole Collar, Orientation, Depth and Interval Information
Uralla Gold Project References
1.
LDR announcement 20 July 2021 titled “Further Assays Enhance & Expand Uralla Gold Project”
2.
LDR announcement 29 July 2021 titled “Lode Ramps Up Exploration at Uralla Gold Project”
3.
LDR announcement 5 October 2021 titled “Enhanced Drill Targets at Uralla Gold Project”
4.
LDR announcement 29 November 2021 titled “Drilling Commences at Uralla Gold Project”
5.
LDR announcement 21 February 2022 titled “Discovery of Gold Mineralisation Over Significant Widths”
6.
LDR announcement 12 March 2024 titled “Significant Auger Drill Program Completed at Uralla Gold Project”
7.
LDR announcement 8 May 2024 titled “Augur Drilling Defines Multiple Targets at Uralla Gold Project”
8.
LDR announcement 12 March 2024 titled “Significant Auger Drill Program Completed at Uralla Gold Project”
Hole Easting Northing RL Azimuth Dip Depth Fom To Interval ETW
Number (m) (deg) (deg) (m) (m) (m) (m) (m)
KTN017A 347722 6611095 1022 0 -50 91 38.0 50.0 12.0 7.7
KTN017B 46.0 50.0 4.0 4.0
KTN018 347719 6611100 1022 352 -50 82 24.0 33.0 9.0 5.8
KTN019 347683 6611068 1028 0 -50 100 54.0 66.0 12.0 7.7
KTN020 347632 6611077 1035 0 -50 82
KTN021 347599 6611075 1039 2 -50 82 27.0 37.0 10.0 6.4
KTN022 347605 6611012 1039 204 -50 49 33.0 35.0 2.0 1.3
KTN023 347608 6611017 1039 152 -50 61 26.0 43.0 17.0 10.9
KTN024 347823 6611012 1006 132 -50 61
KTN025 347906 6611000 1001 243 -50 45 16.0 20.0 4.0 2.6
KTN026A 347745 6611365 1023 310 -50 91 58.0 64.0 6.0 3.9
KTN026B 75.0 77.0 2.0 2.0
KTN027A 347780 6611383 1022 315 -50 97 30.0 32.0 2.0 1.3
KTN027B 64.0 69.0 5.0 5.0
KTN028 347794 6611406 1020 315 -50 83 39.0 46.0 7.0 4.5
KTN029 347715 6611339 1022 310 -50 106
KTN030 347718 6611342 1022 340 -50 85 74.0 80.0 6.0 3.9
KTN031A 347812 6611427 1017 315 -50 88 20.0 25.0 5.0 3.2
KTN031B 47.0 52.0 5.0 5.0
KTN032 347828 6611437 1014 315 -50 61 1.0 3.0 2.0 1.3
KTN033 347853 6611023 1009 160 -50 83 22.0 26.0 4.0 2.6
KTN034 347829 6610912 1005 37 -50 52 34.0 37.0 3.0 1.9
KTN035 347426 6610801 1048 309 -50 73
KTN036 347547 6610788 1035 2 -50 71 7.0 18.0 11.0 7.1
KTN037 347830 6610852 1006 37 -50 73
KTN038 348023 6611012 991 322 -50 62
KTN039 347434 6611083 1034 20 -50 72
KTN040 347438 6611077 1034 300 -50 91
KTN041 347302 6611391 1027 0 -50 76 32.0 34.0 2.0 1.3
KTN042 347705 6610792 1021 2 -50 61
KTN043 349614 6610641 993 346 -50 28 22.0 25.0 3.0 1.9
KTN044 349682 6610696 989 276 -50 70 43.0 46.0 3.0 1.9
KTN045 349749 6610792 977 72 -50 61
No signifciant intercept
No signifciant intercept
No signifciant intercept
No signifciant intercept
No signifciant intercept
No signifciant intercept
(m gda94 z56)
No signifciant intercept
No signifciant intercept
No signifciant intercept
No signifciant intercept
11
Appendix II
Drill Hole Assays - only significant assay results are shown
Sample Hole Fom To Interval Au Sample Hole Fom To Interval Au
Number Number (m) (m) (m) (g/t) Number Number (m) (m) (m) (g/t)
RC02173 KTN017 38.0 39.0 1.0 1.27 RC02612 KTN028 72.0 76.0 4.0 0.11
RC02174 KTN017 39.0 40.0 1.0 0.14 RC02620 KTN029 15.0 16.0 1.0 0.16
RC02181 KTN017 46.0 47.0 1.0 0.51 RC02625 KTN029 23.0 24.0 1.0 0.58
RC02182 KTN017 47.0 48.0 1.0 2.59 RC02627 KTN029 25.0 26.0 1.0 0.12
RC03806 KTN017 48.0 49.0 1.0 0.29 RC02643 KTN029 72.0 73.0 1.0 0.21
RC03807 KTN017 49.0 50.0 1.0 0.20 RC02703 KTN030 63.0 64.0 1.0 0.23
RC02188 KTN017 55.0 59.0 4.0 0.10 RC02710 KTN030 74.0 75.0 1.0 0.34
RC02216 KTN018 24.0 25.0 1.0 2.74 RC02711 KTN030 75.0 76.0 1.0 0.15
RC02217 KTN018 25.0 26.0 1.0 0.84 RC02712 KTN030 76.0 77.0 1.0 0.48
RC02220 KTN018 26.0 27.0 1.0 0.88 RC02713 KTN030 77.0 78.0 1.0 0.73
RC02221 KTN018 27.0 28.0 1.0 0.27 RC03829 KTN030 78.0 79.0 1.0 0.16
RC02223 KTN018 29.0 30.0 1.0 0.29 RC03830 KTN030 79.0 80.0 1.0 0.59
RC02225 KTN018 31.0 32.0 1.0 2.41 RC03832 KTN030 81.0 82.0 1.0 0.12
RC02226 KTN018 32.0 33.0 1.0 1.43 RC02721 KTN031 20.0 21.0 1.0 0.30
RC02240 KTN018 63.0 64.0 1.0 0.19 RC02722 KTN031 21.0 22.0 1.0 1.19
RC02274 KTN019 54.0 55.0 1.0 0.38 RC02723 KTN031 22.0 23.0 1.0 0.71
RC02277 KTN019 57.0 58.0 1.0 0.54 RC02726 KTN031 23.0 24.0 1.0 1.34
RC02278 KTN019 58.0 59.0 1.0 0.10 RC02728 KTN031 24.0 25.0 1.0 1.58
RC03812 KTN019 65.0 66.0 1.0 0.45 RC02750 KTN031 47.0 48.0 1.0 0.31
RC02308 KTN020 32.0 33.0 1.0 0.45 RC02752 KTN031 49.0 50.0 1.0 0.76
RC02316 KTN020 58.0 59.0 1.0 0.18 RC02753 KTN031 50.0 51.0 1.0 0.59
RC02342 KTN021 27.0 28.0 1.0 0.20 RC02772 KTN032 1.0 2.0 1.0 0.88
RC02343 KTN021 28.0 29.0 1.0 0.21 RC02773 KTN032 2.0 3.0 1.0 0.15
RC02344 KTN021 29.0 30.0 1.0 0.16 RC02804 KTN032 45.0 46.0 1.0 0.12
RC02346 KTN021 31.0 32.0 1.0 0.12 RC03833 KTN033 16.0 17.0 1.0 0.13
RC02349 KTN021 32.0 33.0 1.0 1.46 RC03839 KTN033 22.0 23.0 1.0 0.11
RC02350 KTN021 33.0 34.0 1.0 0.53 RC03840 KTN033 23.0 24.0 1.0 0.31
RC02351 KTN021 34.0 35.0 1.0 0.30 RC03841 KTN033 24.0 25.0 1.0 0.52
RC02352 KTN021 35.0 36.0 1.0 1.67 RC03842 KTN033 25.0 26.0 1.0 0.50
RC02353 KTN021 36.0 37.0 1.0 1.02 RC02848 KTN033 68.0 69.0 1.0 0.10
RC02356 KTN021 42.0 46.0 4.0 0.13 RC02859 KTN033 78.0 79.0 1.0 0.12
RC02376 KTN022 33.0 34.0 1.0 0.78 RC02878 KTN034 34.0 35.0 1.0 0.13
RC02379 KTN022 34.0 35.0 1.0 0.35 RC02879 KTN034 35.0 36.0 1.0 0.53
RC02383 KTN022 41.0 45.0 4.0 0.15 RC02883 KTN034 36.0 37.0 1.0 0.31
RC02392 KTN023 26.0 27.0 1.0 0.10 RC03848 KTN036 7.0 8.0 1.0 0.22
RC02393 KTN023 27.0 28.0 1.0 0.50 RC03849 KTN036 8.0 9.0 1.0 0.32
RC02396 KTN023 28.0 29.0 1.0 1.23 RC03852 KTN036 11.0 12.0 1.0 0.10
RC02397 KTN023 29.0 30.0 1.0 1.84 RC02925 KTN036 12.0 13.0 1.0 0.26
RC02398 KTN023 30.0 31.0 1.0 3.26 RC02926 KTN036 13.0 14.0 1.0 1.24
RC02399 KTN023 31.0 32.0 1.0 0.41 RC02929 KTN036 14.0 15.0 1.0 0.11
RC02404 KTN023 42.0 43.0 1.0 0.37 RC02930 KTN036 15.0 16.0 1.0 0.11
RC02418 KTN024 8.0 12.0 4.0 0.11 RC02931 KTN036 16.0 17.0 1.0 0.83
RC02421 KTN024 17.0 18.0 1.0 0.12 RC02932 KTN036 17.0 18.0 1.0 0.18
RC03814 KTN025 16.0 17.0 1.0 0.78 RC02946 KTN036 37.0 38.0 1.0 0.33
RC03815 KTN025 17.0 18.0 1.0 2.28 RC02963 KTN036 65.0 66.0 1.0 0.12
RC03816 KTN025 18.0 19.0 1.0 2.77 RC02967 KTN036 68.0 69.0 1.0 0.18
RC03817 KTN025 19.0 20.0 1.0 0.20 RC03052 KTN039 41.0 42.0 1.0 0.21
RC02486 KTN026 52.0 53.0 1.0 0.12 RC03062 KTN039 54.0 55.0 1.0 0.11
RC02492 KTN026 58.0 59.0 1.0 0.20 RC03063 KTN039 55.0 56.0 1.0 0.50
RC02495 KTN026 59.0 60.0 1.0 0.31 RC03856 KTN040 39.0 40.0 1.0 0.11
RC02496 KTN026 60.0 61.0 1.0 0.55 RC03857 KTN041 32.0 33.0 1.0 0.36
RC02499 KTN026 63.0 64.0 1.0 3.19 RC03858 KTN041 33.0 34.0 1.0 0.39
RC02505 KTN026 75.0 76.0 1.0 0.74 RC03115 KTN041 42.0 43.0 1.0 0.11
RC02507 KTN026 76.0 77.0 1.0 0.23 RC03140 KTN042 13.0 14.0 1.0 0.22
RC02513 KTN027 4.0 6.0 2.0 0.11 RC03144 KTN042 22.0 23.0 1.0 0.16
RC03824 KTN027 30.0 31.0 1.0 3.18 RC03149 KTN042 25.0 26.0 1.0 0.16
RC03825 KTN027 31.0 32.0 1.0 3.51 RC03151 KTN042 26.0 27.0 1.0 0.21
RC02542 KTN027 64.0 65.0 1.0 0.28 RC03153 KTN042 27.0 28.0 1.0 0.18
RC02545 KTN027 65.0 66.0 1.0 1.76 RC03160 KTN042 44.0 45.0 1.0 0.30
RC02546 KTN027 66.0 67.0 1.0 0.31 RC03164 KTN042 48.0 52.0 4.0 0.11
RC02548 KTN027 68.0 69.0 1.0 0.12 RC03175 KTN043 22.0 23.0 1.0 0.69
RC02566 KTN027 90.0 91.0 1.0 0.10 RC03176 KTN043 23.0 24.0 1.0 0.25
RC02593 KTN028 39.0 43.0 4.0 0.11 RC03177 KTN043 24.0 25.0 1.0 0.11
RC02594 KTN028 43.0 44.0 1.0 0.17 RC03191 KTN044 36.0 37.0 1.0 0.14
RC02595 KTN028 44.0 45.0 1.0 0.65 RC03199 KTN044 43.0 44.0 1.0 0.30
RC02596 KTN028 45.0 46.0 1.0 0.77 RC03200 KTN044 44.0 45.0 1.0 0.78
RC02604 KTN028 57.0 58.0 1.0 0.30 RC03201 KTN044 45.0 46.0 1.0 0.27
RC02609 KTN028 63.0 64.0 1.0 0.21
12
Appendix III
JORC Code, 2012 Edition - Table 1.
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and Quality of sampling (e.g. cut
channels, random chips or specific
specialized industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments etc.).
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverized to
produce 30g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling problems.
Unusual commodities or sampling types
(e.g. submarine nodules) may warrant
disclosure of detailed information.
• Industry standard Reverse Circulation (RC) drilling
techniques were used at the Uralla project to obtain
rock chip samples.
• The holes were 5 inch in size.
• RC samples were collected using a 3-way cone
splitter. Samples were collected every metre.
• Composite samples were collected using a
sampling spear.
• The RC sample weight range was between 0.65kg
to 7.6kg with the average sample weight being
2.5kg. This is considered appropriate for this style of
sampling.
• Barren samples were composited together in 4m
composites. Samples containing visible alteration
and mineralisation were sampled per metre.
• Samples were collected by a qualified geologist
• Sampling techniques are considered appropriate for
the style of mineralisation
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g.core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit
or other type, whether core is oriented
and if so, by what method, etc).
• Industry standard Reverse Circulation (RC) drilling
techniques were used at Uralla Gold Project to
obtain rock samples.
• The holes were 5 inch in size.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• The RC samples were weighed to determine
recoveries.
• Recoveries in fresh rock were excellent at 99%
recovery.
• No relationship exists between sample recovery and
grade.
Logging • Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative of
quantitative in nature. Core (or
costean, channel etc) photography.
• Drill holes were geologically logged by an
experienced geologist to industry standard.
• Geological logs were qualitative with quantitative
estimates of mineral contents.
• Quantitative logging includes sulphide and vein
percentages.
• A representative sample was retained and stored
in chip trays per metre.
• Chip trays were photographed.
13
Criteria JORC Code explanation Commentary
Sub- sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• The RC samples were split on the rig using a 3-way
cone splitter.
• Barren samples were composited together into 4m
composites using a sampling spear.
• Samples containing visible alteration and
mineralisation were sampled per metre.
• Samples were sent to ALS Brisbane.
• QAQC included industry best practice insertion of
duplicate, standards and blanks at >5%.
• All QAQC performed within acceptable limits
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
• Samples were stored in a secure location and
transported to the ALS laboratory in Brisbane by
LDR staff.
• Sample preparation comprised drying (DRY-21),
weighing, crushing to 70% passing 2mm (CRU-31)
and a 1kg split pulverized to 85% passing 75um
(PUL-32).
• The assay methods included 4 acid digest followed
by multi element ICP-AES spectrometry
(MEICP61). Gold
Share your feedback
Discover